scholarly journals Schedule optimization for scattered repetitive projects

2022 ◽  
Vol 133 ◽  
pp. 104042
Author(s):  
Tarek Hegazy ◽  
Ehab Kamarah
2013 ◽  
Vol 791-793 ◽  
pp. 1423-1426
Author(s):  
Hai Min Wei ◽  
Rong Guang Liu

Project schedule management is the management to each stage of the degree of progress and project final deadline in the project implementation process. Its purpose is to ensure that the project can meet the time constraints under the premise of achieving its overall objectives.When the progress of schedule found deviation in the process of schedule management ,the progress of the plan which have be advanced previously need to adjust.This article mainly discussed to solve the following two questions:establish the schedule optimization model by using the method of linear;discuss the particle swarm optimization (PSO) algorithm and its parameters which have effect on the algorithm:Particle swarm optimization (PSO) algorithm is presented in the time limited project and the application of a cost optimization.


Author(s):  
Li Wang ◽  
Changchun Wu ◽  
Lili Zuo ◽  
Yanfei Huang ◽  
Haihong Chen

Transfer tank farms play an important role in an oil products pipeline network, which receive oil products from upstream pipelines and deliver them to downstream pipelines. The scheduling problem for oil products supply chain is very complicated because of numerous constraints to be considered. The published literatures on schedule optimization of oil products pipeline network usually focus on the batch plans of each pipeline, without consideration on the receipt and delivery schedule of transfer tank farm. In this paper, a mixed-integer linear programming (MILP) model is developed for the schedule optimization of transfer tank farm. The objective of the model is to minimize switching times of the tank operations of a tank farm during a planning horizon, while fulfilling the products transmission requirements of the upstream and downstream pipelines of the tank farm. The constraints of the model include material balance, the operational rules of tanks, the topological structure constraints of the tank farm, the settling period of the oil products stored in dedicated tank and so on. To satisfy the constraint of fulfilling the specific transmission requirements of pipelines, concepts of static and dynamic time slot are proposed. A continuous time representation is used to obtain accurate optimal schedules and decrease scale of the model by reducing the number of variables. The model is solved by CPLEX solver for a transfer tank farm of an oil products pipeline network in China. Some examples are tested under different scenarios and the results show that global optimal solution can be obtain at acceptable computational costs.


2010 ◽  
Vol 97-101 ◽  
pp. 2650-2653
Author(s):  
Xin Lin ◽  
Ya Bo Luo

Numerical Control (NC) equipments sharing over Internet is a potential approach for improving the utilization of capacity, which is still a complex NP hard difficulty due to the complexity of schedule. This research takes the Constraints Satisfied Problem (CSP) thinking to solve the above problem employing grid technology. First, regarding the NC equipments sharing as CSP, the CSP model for NC equipments grid is developed taking the flexible constraints as the optimum objective and the rigid constraints as the boundary conditions. Second, the detailed algorithm and steps for optimization of NC equipments grid workflow based on Just-In-Time (JIT) thinking are proposed. Finally the digital experiment demonstrates the advantages of the CSP-driven methodology that has the higher efficiency for searching optimum solution.


Sign in / Sign up

Export Citation Format

Share Document