Railway disruption management: Designing bus bridging services under uncertainty

2021 ◽  
Vol 131 ◽  
pp. 105284
Author(s):  
Chunling Luo ◽  
Lei Xu
2015 ◽  
Vol 8 (4) ◽  
pp. 151
Author(s):  
Stanislav Szabo ◽  
Dorota Liptáková ◽  
Iveta Vajdova

2021 ◽  
Author(s):  
Mark M. Dekker ◽  
Rolf N. van Lieshout ◽  
Robin C. Ball ◽  
Paul C. Bouman ◽  
Stefan C. Dekker ◽  
...  

AbstractRailway systems occasionally get into a state of being out-of-control, meaning that barely any train is running, even though the required resources (infrastructure, rolling stock and crew) are available. Because of the large number of affected resources and the absence of detailed, timely and accurate information, currently existing disruption management techniques cannot be applied in out-of-control situations. Most of the contemporary approaches assume that there is only one single disruption with a known duration, that all information about the resources is available, and that all stakeholders in the operations act as expected. Another limitation is the lack of knowledge about why and how disruptions accumulate and whether this process can be predicted. To tackle these problems, we develop a multidisciplinary framework combining techniques from complexity science and operations research, aiming at reducing the impact of these situations and—if possible—avoiding them. The key elements of this framework are (i) the generation of early warning signals for out-of-control situations, (ii) isolating a specific region such that delay stops propagating, and (iii) the application of decentralized decision making, more suited for information-sparse out-of-control situations.


2021 ◽  
pp. 1-13
Author(s):  
Ning Tao ◽  
Duan Xiaodong ◽  
An Lu ◽  
Gou Tao

A disruption management method based on cumulative prospect theory is proposed for the urgent with deteriorating effect arrival in flexible job shop scheduling problem (FJSP). First, the mathematical model of problem is established with minimizing the completion time of urgent order, minimizing the total process time of the system and minimizing the total cost as the target. Then, the cumulative prospect theory equation of the urgent arrival in job shop scheduling process is induced designed. Based on the selected model, an optimized multi-phase quantum particle swarm algorithm (MQPSO) is proposed for selecting processing route. Finally, using Solomon example simulation and company Z riveting shop example as the study object, the performance of the proposed method is analyzed. It is compared with the current common rescheduling methods, and the results verify that the method proposed in this paper not only meets the goal of the optimized objects, but improves the practical requirements for the stability of production and processing system during urgent arrival. Lastly, the optimized multiphase quantum particle swarm algorithm is used to solve disruption management of urgent arrival problem. Through instance analysis and comparison, the effectiveness and efficiency of urgent arrival disruption management method with deteriorating effect are verified.


2007 ◽  
Vol 13 (3) ◽  
pp. 149-162 ◽  
Author(s):  
Niklas Kohl ◽  
Allan Larsen ◽  
Jesper Larsen ◽  
Alex Ross ◽  
Sergey Tiourine

2016 ◽  
Vol 106 (09) ◽  
pp. 631-636
Author(s):  
H. Prinzhorn ◽  
M. Zenker ◽  
R. Sporrer ◽  
P. Prof. Nyhuis

Die hohe Störfanfälligkeit bei der Montage großskaliger Produkte verlangt eine kurzfristige Auswahl von Maßnahmen zur Reaktion auf Störungen, um Auswirkungen wie Lieferterminverspätungen oder Auslastungsverluste zu reduzieren. Die Nutzung von Flexibilitätspotenzialen eines Produktionssystems stellt einen Ansatz dar, um diese Herausforderung zu bewältigen. Dieser Fachbeitrag zeigt auf, welche Flexibilitätspotenziale in diesem speziellen Umfeld zur Verfügung stehen und genutzt werden können.   Assembling large-scale products involves frequent process interruptions why in order to reduce the impact of interruptions, a short-term response is necessary to reduce delivery delays and idle times of resources. An approach for challenge this represents the flexibility of a production system. Regarding the environment of large-scale product assembly, it has to be shown which potentials of flexibility are able to use in a short-term manner.


2018 ◽  
pp. 195-224
Author(s):  
Shabnam Rezapour ◽  
Amirhossein Khosrojerdi ◽  
Golnoosh Rasoulifar ◽  
Janet K. Allen ◽  
Jitesh H. Panchal ◽  
...  

2018 ◽  
Vol 52 (6) ◽  
pp. 1391-1411 ◽  
Author(s):  
Evelien van der Hurk ◽  
Leo Kroon ◽  
Gábor Maróti

2015 ◽  
Vol 21 (1) ◽  
pp. 65-86 ◽  
Author(s):  
Cecilia Simón ◽  
Jesús Alonso-Tapia

This study analyse the role of disruption management strategies and its effects, in interaction with the classroom motivational climate (CMC), on the decrease of disruptive behaviour and on the perception of teaching quality. For this purpose, the Disruption Management Climate Questionnaire (DMCQ) was developed. A total of 827 Secondary-School students formed the sample. To validate the DMCQ, confirmatory factor and regression analyses were realised. Children’s attribution to teacher’s coping strategies of decrease in disruptive behaviour, and of perceived change in satisfaction with teacher’s work as an index of teaching quality, were used as external criteria. Results support hypotheses related to DMCQ structure, and to its role as predictor of the degree of disruption decrease, but not the hypothesis related to satisfaction with teachers’ work, that depends mainly on CMC. These results underlie the importance of acting on DMCQ and CMC components to favour the teacher practices.


Sign in / Sign up

Export Citation Format

Share Document