A redispersible dry emulsion system with simvastatin prepared via fluid bed layering as a means of dissolution enhancement of a lipophilic drug

2018 ◽  
Vol 549 (1-2) ◽  
pp. 325-334 ◽  
Author(s):  
Mitja Pohlen ◽  
Luka Pirker ◽  
Matevž Luštrik ◽  
Rok Dreu
2020 ◽  
Vol 08 (09) ◽  
pp. 114-124
Author(s):  
David Quintanar-Guerrero ◽  
Edgar Aguilera Cerón ◽  
María Elena Trujillo Ortega ◽  
Sofia González Gallardo ◽  
Alejandro Vargas Sánchez ◽  
...  

1991 ◽  
Vol 39 (12) ◽  
pp. 3362-3364 ◽  
Author(s):  
Hirofumi TAKEUCHI ◽  
Hideto SASAKI ◽  
Toshiyuki NIWA ◽  
Tomoaki HINO ◽  
Yoshiaki KAWASHIMA ◽  
...  

2013 ◽  
Vol 13 (3) ◽  
Author(s):  
Djawardi Djawardi ◽  
Yustiar Gunawan

The business unit's black tea processing of Perkebunan Nusantara suffered a loss of approximately Rp.60 billion. This is caused by the failure to achieve the quality and quantity of production which has been targeted by the management. Black tea processing factory "Pahit Madu" is required to improve the performance of the production process. To improve the production of black tea starts from improved production equipment through improved equipment utilization. One method ofmeasuring the effectiveness of using an apparatus is Overall EquipmentEffectiveness (OEE). OEE calculation results show that black tea factory "Pahit Madu" for four (4) years under the standard. Means, the effectiveness of utilization of equipment in the factory black tea "Pahit Madu" was still very low. This was shown by the low performance equipment in the milling unit, drying unit and sortation unit. Toimprove the performance of the plant should begin by increasing the Cutting Tearing Curling (CTC) machine in milling stations, machines Fluid Bed Dryer (FBD) and Heat Exchanger (HE) at the drying stations, and Winnower machines at the sortation stations.


Sign in / Sign up

Export Citation Format

Share Document