Measuring the reduction limit of repeated recycling – a case study of the paper flow system
2016 ◽
Vol 132
◽
pp. 98-107
◽
Keyword(s):
2018 ◽
Vol 204
◽
pp. 02009
◽
Keyword(s):
Keyword(s):
2010 ◽
Vol 342
(2)
◽
pp. 151-161
◽
Keyword(s):
2009 ◽
Vol 51
(4)
◽
pp. 311-329
◽
Keyword(s):
Keyword(s):
Tool requirement and pre-scheduling optimization model of the tool flow system of a digital workshop
2017 ◽
Vol 231
(5)
◽
pp. 838-849