The groundwater budget: A tool for preliminary estimation of the hydraulic connection between neighboring aquifers

2018 ◽  
Vol 556 ◽  
pp. 72-86 ◽  
Author(s):  
Stefano Viaroli ◽  
Lucia Mastrorillo ◽  
Francesca Lotti ◽  
Vittorio Paolucci ◽  
Roberto Mazza
Author(s):  
Alexander G. Okhapkin ◽  
Tabet Hhedairia

The preliminary estimation of composition and structure of diatoms in the benthos of the Oka River allowed to determine the clear spatiotemporal confinedness of structure in such communities of them which has the most diverse composition in the low water period while water temperature decreasing.


Hydrobiologia ◽  
2006 ◽  
Vol 557 (1) ◽  
pp. 97-106 ◽  
Author(s):  
N. Chartosia ◽  
A. Koukouras ◽  
M. Mavidis ◽  
M. -S. Kitsos

2005 ◽  
Vol 42 (5) ◽  
pp. 1461-1473 ◽  
Author(s):  
B D Smerdon ◽  
C A Mendoza ◽  
A M McCann

Quantitative investigations, including two aquifer tests and development of a three-dimensional (3D) groundwater flow model, were required to determine the hydraulic connection between an irrigation reservoir and a buried valley aquifer in southern Alberta. Evidence of seepage was detected in the buried valley aquifer 10 km east of the Pine Coulee reservoir at the onset of filling in 1999, when the reservoir level exceeded an elevation of 1035 m above sea level (a.s.l.). Concern for an increase in the local water table and the creation of artesian conditions in the aquifer prompted this study to determine the approximate location of a seepage window that appeared to be connecting the reservoir and aquifer. Observations of hydraulic head in the aquifer during the pumping tests revealed a barrier boundary when the reservoir level was at an elevation of 1035 m a.s.l. and a recharge boundary condition when the elevation exceeded 1039 m a.s.l. These data were used to calibrate a 3D groundwater flow model, which was needed to determine the hydraulic properties and approximate location of the leakage zone. The quantitative investigation showed that seepage likely occurred through the sideslopes of the flooded coulee, rather than through the low-permeability coulee floor sediments or the embankment dam. Further simulations illustrated the expected seepage rates at various reservoir supply levels and the pumping rates required for relief wells installed in the buried valley aquifer to maintain historic aquifer hydraulic head. A brief postanalysis indicated that the forecasted pumping rates were only 15% lower than have been required to maintain preconstruction water levels in the buried valley aquifer.Key words: dams, seepage analysis, groundwater modelling, buried valley aquifer, pumping test.


2013 ◽  
Vol 34 (2) ◽  
pp. 253-260 ◽  
Author(s):  
W. Czerwiński ◽  
R. Gancarz ◽  
E. Przybyłka ◽  
J. S. Wieczorek

The physiological activity of twenty one 9-amine-9-fluorenephosphonic acid derivatives was tested. The compounds were synthesized by the Wrocław Technical University. <i>Spirodela oligorrhiza</i> was used as the test plant. There was tested the inhibiting influence of these compounds on the growth of <i>Spirodela</i> and synergism with the herbicide "mecoprop". Ethyl esters substituted at the nitrogen atom with buthyl and heptyl group appeared to be most active. Their concentration of 0.5-1.5 × 10<sup>-5</sup> M inhibited the growth of <i>Spirodela</i> by 50%. Most of the 9-amine-9-fluorenephosphonic acid derivatives tested with different substitutes showed a strong synergism with the herbicide "mecoprop". An addition of these compounds to sublethal solution of the herbicide killed <i>Spirodela</i> within 10-20 houres.


Sign in / Sign up

Export Citation Format

Share Document