Fluid-rock interactions and porosity genesis in deep clastic reservoirs: A perspective of differential oil charge intensity

2021 ◽  
pp. 105508
Author(s):  
Dongming Zhi ◽  
Xun Kang ◽  
Zhijun Qin ◽  
Yong Tang ◽  
Jian Cao ◽  
...  
2021 ◽  
Vol 88 ◽  
pp. 103797
Author(s):  
Ahmed A. Radwan ◽  
Bassem S. Nabawy ◽  
Ahmed Abdelmaksoud ◽  
Aref Lashin

2021 ◽  
Author(s):  
Suria Amalia Suut ◽  
Mahmood Khamis Al Kalbani ◽  
Issa Quseimi ◽  
Abdullah Gahaffi ◽  
Arjen Wielaard ◽  
...  

Abstract This paper summarises a ONE development success story of reviving a mature brownfield in South of Oman, Field β, just within ONE year through collaboration between different disciplines, comprehensive data analysis, optimising and recompletion of existing wells. Field β, comprised of multi-stacked clastic reservoirs, was put on stream in 1980s and peaked in early 1990s. Pilot water injection started in 1993 and full field water flooding continued in 1997. After more than 35 years since start of production, one can say the field was already in the tail end of its life. It had been stabilizing at low rate after 25 years and starting to decline further and at some point was one of the potential candidates to be decommissioned. A new FDP (FDP18) for part of the field was delivered in 2018 with the first well drilled at the end of that year. In 2019, despite drilling further wells on the FDP18, production was declining and was at 2018 rate towards the year end. Intensive data analysis and integrated reservoir reviews per reservoir layers were actively performed and new opportunities and data gathering were identified. FDP18 wells from 2019 onwards were then deepened to also acquire log data over deeper than the target reservoirs. Further synergy between asset and exploration teams also instigated in new discoveries including oil in shallower carbonate reservoirs, which were logged and sampled when drilling the FDP18 wells. Declining production, low oil price and COVID-19 crisis that hit 2020 challenged the team to be more resilient and with ONE development mindset between development and WRFM team, also between asset and exploration team, existing long-term closed in and very low productivity wells were utilised to tap these new opportunities. As a result, the field production has been increased by more than double, highest since 10 years ago, with a potential of triple its production rate, all achieved through optimizing and recompletion of existing wells within 1 year, at a very attractive low UTC.


Sign in / Sign up

Export Citation Format

Share Document