Non-convex costs and capital utilization: A study of production scheduling at automobile assembly plants
2000 ◽
Vol 45
(3)
◽
pp. 681-716
◽
Keyword(s):
2018 ◽
Vol 12
(3)
◽
pp. JAMDSM0081-JAMDSM0081
Keyword(s):
2019 ◽
Vol 9
(2)
◽
pp. 171
Keyword(s):
2010 ◽
Vol 5
(3)
◽
pp. 310
2005 ◽
Vol 12
(1)
◽
pp. 5-15
◽