Concrete Creep Modeling: Application to Slabs on Ground

2019 ◽  
Vol 145 (10) ◽  
pp. 04019078
Author(s):  
Ya Wei ◽  
Siming Liang ◽  
Jingsong Huang
Author(s):  
Charles J. Oswald

Measurements made on a long span reinforced concrete arch culvert under 7.3 m (24 ft) of silty clay backfill were compared with results from finite-element analyses of the soil-structure system using the CANDE finite-element code. The culvert strains and deflections and the soil pressure on the culvert were measured during construction and during the following 2.5 years at three instrumented cross sections. The CANDE program was modified to account for the effects of concrete creep and shrinkage strains after it was noted that the measured postconstruction culvert deflection and strains increased significantly whereas the measured soil pressure on the culvert remained relatively constant. Good agreement was generally obtained between measured and calculated values of the culvert strain and deflection and the soil pressure during the entire monitoring period after the code was modified.


2015 ◽  
Vol 71 ◽  
pp. 14-28 ◽  
Author(s):  
F. Lavergne ◽  
K. Sab ◽  
J. Sanahuja ◽  
M. Bornert ◽  
C. Toulemonde

1979 ◽  
Vol 105 (3) ◽  
pp. 487-489
Author(s):  
Erhan Cinlar ◽  
ElMamoun Osman ◽  
Zdeněk P. Bažant

2018 ◽  
Vol 8 (12) ◽  
pp. 2598 ◽  
Author(s):  
Haiying Ma ◽  
Xuefei Shi ◽  
Yin Zhang

Twin-I girder bridge systems composite with precast concrete deck have advantages including construction simplification and improved concrete strength compared with traditional multi-I girder bridge systems with cast-in-place concrete deck. But the cracking is still a big issue at interior support for continuous span bridges using twin-I girders. To reduce cracks occurrence in the hogging regions subject to negative moments and to guarantee the durability of bridges, the most essential way is to reduce the tensile stress of concrete deck within the hogging regions. In this paper, the prestressed tendons are arranged to prestress the precast concrete deck before it is connected with the steel girders. In this way, the initial compressive stress induced by the prestressed tendons in the concrete deck within the hogging region is much higher than that in regular concrete deck without prestressed tendons. A finite element analysis is developed to study the long-term behaviour of prestressed concrete deck for a twin-I girder bridge. The results show that the prestressed tendons induce large compressive stresses in the concrete deck but the compressive stresses are reduced due to concrete creep. The final compressive stresses in the concrete deck are about half of the initial compressive stresses. Additionally, parametric study is conducted to find the effect to the long-term behaviour of concrete deck including girder depth, deck size, prestressing stress and additional imposed load. The results show that the prestressing compressive stress in precast concrete deck is transferred to steel girders due to concrete creep. The prestressed forces transfer between the concrete deck and steel girder cause the loss of compressive stresses in precast concrete deck. The prestressed tendons can introduce some compressive stress in the concrete deck to overcome the tensile stress induced by the live load but the force transfer due to concrete creep needs be considered. The concrete creep makes the compressive stress loss and the force redistribution in the hogging regions, which should be considered in the design the twin-I girder bridge composite with prestressed precast concrete deck.


Sign in / Sign up

Export Citation Format

Share Document