Modified Bayesian Network–Based Risk Analysis of Construction Projects: Case Study of South Pars Gas Field Development Projects

Author(s):  
Ali Namazian ◽  
Siamak Haji Yakhchali
2021 ◽  
Author(s):  
Kumar Nathan ◽  
M Arif Iskandar Ghazali ◽  
M Zahin Abdul Razak ◽  
Ismanto Marsidi ◽  
Jamari M Shah

Abstract Abandonment is considered to be the last stage in the oil gas field cycle. Oil and gas industries around the world are bounded by the necessity of creating an abandonment program which is technically sound, complied to the stringent HSE requirement and to be cost-effective. Abandonment strategies were always planned as early as during the field development plan. When there are no remaining opportunities left or no commercially viable hydrocarbon is present, the field need to be abandoned to save operating and maintenance cost. The cost associated on abandonment can often be paid to the host government periodically and can be cost recoverable once the field is ready to be abandoned. In Malaysia, some of the oil producing fields are now in the late life of production thus abandonment strategies are being studied comprehensively. The interest of this paper is to share the case study of one of a field that is in its late life of production and has wells and facilities that planned to be abandon soon. The abandonment in this field is challenging because it involves two countries, as this field is in the hydrocarbon structure that straddling two countries. Series of techno-commercial discussion were held between operators of these two countries to gain an integrated understanding of the opportunity, defining a successful outcome of the opportunity and creating an aligned plan to achieve successful abandonment campaign. Thus, this paper will discuss on technical aspects of creating a caprock model, the execution strategies of abandoning the wells and facilities and economic analysis to study whether a joint campaign between the operators from two countries yields significantly lower costs or otherwise.


2014 ◽  
Author(s):  
Ardian Nengkoda ◽  
Mofeed Awwami ◽  
Xiaolong Cai ◽  
Jamal Mufleh ◽  
Bader Harbi ◽  
...  

1976 ◽  
Vol 16 (1) ◽  
pp. 107
Author(s):  
M. A. Delbaere

Oilfield operators have always looked for ways of reducing the costs of oil and gas development projects and especially when investment costs were critical to project economics. Tubingless completions have evolved over the last 30 years in North America to fill the need for reduced investment costs particularly in the case of fields with either limited reserves or limited profitability.Tubingless completions basically utilise small diameter tubulars to function as both production casing and flowstring. The tubulars are cemented in the borehole, not to be removed or recovered until the field is depleted and/or the well abandoned. The technique is limited in application to those fields with no corrosion or wax or hydrate problems and with a limited requirement for reservoir stimulation and workovers. The greater the number of operations performed within the tubingless well bore the greater the risk of losing the well.The main benefits of tubingless completions are as follows:Reduction in development well completion costs.Marginally productive hydrocarbon zones can be completed and tested.Completion of individual gas zones of multi-pay wells within their own permanently segregated flowstrings at much lower capital and operating costs.The experience this far with Kincora gas field development wells indicates the tubingless completion method to be completely feasible for gas wells drilled in the Surat Basin and possibly in other areas of Australia.


2016 ◽  
Author(s):  
D. Park ◽  
I. Song ◽  
Y. Bae ◽  
M. Kikuchi ◽  
J. P. Ling ◽  
...  
Keyword(s):  

2014 ◽  
Vol 1073-1076 ◽  
pp. 592-596
Author(s):  
Pei Luo ◽  
Yu Ming Luo ◽  
Kai Ma ◽  
Biao Zhang ◽  
Sha Sha Song

In the process of high sulfur gas field development, the sulfur will separate out from the mixed gas when the pressure near wellbore area drops to a critical pressure of H2S. This will reduce the reservoir porosity greatly and decrease the gas well productivity as well. This paper discusses the characteristics of pressure transient testing plots when sulfur deposition occurs based on the redial composite reservoir model. And introduce an approach to determine the sulfur deposition radius near the wellbore with pressure transient testing interpretation in high sulfur gas reservoir. The method has been applied in some high sulfur gas field in eastern Sichuan Basin. The result shows that the method is simple and practical.


2006 ◽  
Vol 3 (2) ◽  
pp. 223-237
Author(s):  
Bruno Nogueira Silva ◽  
Leonardo Lima Gomes ◽  
Rodrigo Loureiro Medeiros

2015 ◽  
Author(s):  
Adenike Sonde ◽  
Uchechukwu Ozoemene ◽  
Udoka Nwabudike ◽  
Florence Ifeanyi-Onah ◽  
Okiemute Amuboh ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document