Combining differential SAR interferometry and the probability integral method for three-dimensional deformation monitoring of mining areas

2016 ◽  
Vol 37 (21) ◽  
pp. 5196-5212 ◽  
Author(s):  
Xinpeng Diao ◽  
Kan Wu ◽  
Dahe Hu ◽  
Liang Li ◽  
Dawei Zhou
2021 ◽  
Vol 13 (8) ◽  
pp. 1497
Author(s):  
Mengyao Shi ◽  
Honglei Yang ◽  
Baocun Wang ◽  
Junhuan Peng ◽  
Zhouzheng Gao ◽  
...  

Coal-mining subsidence causes ground fissures and destroys surface structures, which may lead to severe casualties and economic losses. Time series interferometric synthetic aperture radar (TS-InSAR) plays an important role in surface deformation detection and monitoring without the restriction of weather and sunlight conditions. In addition, the probability integral method (PIM) is a surface movement model that is widely used in the field of mining subsidence. In recent years, the integration of TS-InSAR and the PIM has been extensively studied. In this paper, we propose a new method to estimate mining subsidence with the PIM based on TS-InSAR results. This study focuses on the improvement of a boundary constraint and dynamic parameter estimation in the PIM through the inversion of the line-of-sight (LOS) time series deformation derived by TS-InSAR. In addition, 45 Sentinel-1A images from 17 June 2015 to 27 December 2017 of a coal mine in Jiaozuo are utilized to acquire the surface displacement. We apply a time series deformation analysis using small baseline subsets (SBAS) and place the results into an improved PIM to estimate the mining parameters. The simulated mining subsidence is highly consistent with the leveling data, exhibiting an RMSE of 0.0025 m. Compared with the conventional method, the proposed method is more accurate in discovering displacement in mining areas. In the final section of this paper, some sources of error that affect the experiment are discussed.


2020 ◽  
Vol 10 (18) ◽  
pp. 6623
Author(s):  
Xianfeng Tan ◽  
Bingzhong Song ◽  
Huaizhi Bo ◽  
Yunwei Li ◽  
Meng Wang ◽  
...  

Underground coal mining-induced ground subsidence (or major ground vertical settlement) is a major concern to the mining industry, government and people affected. Based on the probability integral method, this paper presents a new ground subsidence prediction method for predicting irregularly shaped coal mining area extraction-induced ground subsidence. Firstly, the Delaunay triangulation method is used to divide the irregularly shaped mining area into a series of triangular extraction elements. Then, the extraction elements within the calculation area are selected. Finally, the Monte Carlo method is used to calculate extraction element-induced ground subsidence. The proposed method was tested by two experimental data sets: the simulation data set and direct leveling-based subsidence observations. The simulation results show that the prediction error of the proposed method is proportional to mesh size and inversely proportional to the amount of generated random points within the auxiliary domain. In addition, when the mesh size is smaller than 0.5 times the minimum deviation of the inflection point of the mining area, and the amount of random points within an auxiliary domain is greater than 800 times the area of the extraction element, the difference between the proposed method-based subsidence predictions and the traditional probability integral method-based subsidence predictions is marginal. The measurement results show that the root-mean-square error of the proposed method-based subsidence predictions is smaller than 3 cm, the average of absolute deviations of the proposed method-based subsidence predictions is 2.49 cm, and the maximum absolute deviation is 4.05 cm, which is equal to 0.75% of the maximum direct leveling-based subsidence observation.


Author(s):  
H. D. Fan ◽  
X. X. Gao ◽  
D. Cheng ◽  
W. Y. Zhao ◽  
C. L. Zhao

A new solution algorithm that combined D-InSAR and probability integral method was proposed to generate the three dimensional deformation in mining area. The details are as follows: according to the geological and mining data, the control points set should be established, which contains correct phase unwrapping points in subsidence basin edge generated by D-InSAR and several GPS points; Using the modulus method to calculate the optimum parameters of probability integral prediction; Finally, generate the three dimensional deformation of mining work face by the parameters. Using this method, the land subsidence with big deformation gradients in mining area were correctly generated by example TerraSAR-X images. The results of the example show that this method can generate the correct mining subsidence basin with a few surface observations, and it is much better than the results of D-InSAR.


2010 ◽  
Vol 47 (7) ◽  
pp. 1114-1125 ◽  
Author(s):  
G. Herrera ◽  
R. Tomás ◽  
F. Vicente ◽  
J.M. Lopez-Sanchez ◽  
J.J. Mallorquí ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document