A Study on the Development Technology of Sidetracking Wells in Fault Block Reservoirs During the High Water Cut Stage

2013 ◽  
Vol 31 (5) ◽  
pp. 465-471 ◽  
Author(s):  
C. Chuanzhi ◽  
Z. Xiaoyan
Energies ◽  
2020 ◽  
Vol 13 (2) ◽  
pp. 402
Author(s):  
Kang Ma ◽  
Hanqiao Jiang ◽  
Junjian Li ◽  
Rongda Zhang ◽  
Kangqi Shen ◽  
...  

As the mature oil fields have stepped into the high water cut stage, the remaining oil is considered as potential reserves, especially the attic oil in the inclined fault-block reservoirs. A novel assisted gas–oil countercurrent technique utilizing gas oil countercurrent (GOC) and water flooding assistance (WFA) is proposed in this study to enhance the remaining oil recovery in sealed fault-block reservoirs. WFA is applied in our model to accelerate the countercurrent process and inhibit the gas channeling during the production process. Four comparative experiments are conducted to illustrate enhanced oil recovery (EOR) mechanisms and compare the production efficiency of assisted GOC under different assistance conditions. The results show that WFA has different functions at different stages of the development process. In the gas injection process, WFA forces the injected gas to migrate upward and shortens the shut-in time by approximately 50% and the production efficiency improves accordingly. Compared with the basic GOC process, the attic oil swept area is extended 60% at the same shut-in time condition and secondary gas cap forms under the influence of WFA. At the production stage, the WFA and secondary gas cap expansion form the bi-directional flooding. The bi-directional flooding also displaces the bypassed oil and replaced attic oil located below the production well, which cannot be swept by the gas cap expansion. WFA inhibits the gas channeling effectively and increases the sweep factor by 26.14% in the production stage. The oil production increases nearly nine times compared with the basic GOC production process. The proposed technique is significant for the development of attic oil in the mature oil field at the high water cut stage.


Author(s):  
Jie Tan ◽  
Ying-xian Liu ◽  
Yan-lai Li ◽  
Chun-yan Liu ◽  
Song-ru Mou

AbstractX oilfield is a typical sandstone reservoir with big bottom water in the Bohai Sea. The viscosity of crude oil ranges from 30 to 425 cp. Single sand development with the horizontal well is adopted. At present, the water content is as high as 96%. The water cut of the production well is stable for a long time in the high water cut period. The recoverable reserves calculated by conventional methods have gradually increased, and even the partial recovery has exceeded the predicted recovery rate. This study carried out an oil displacement efficiency experiment under big water drive multiple to accurately understand an extensive bottom water reservoir's production law in an ultra-high water cut stage. It comprehensively used the scanning electron microscope date, casting thin section, oil displacement experiment, and production performance to analyze the change law of physical properties and relative permeability curve from the aspects of reservoir clay minerals, median particle size, pore distribution, and pore throat characteristics. Therefore, the development law of horizontal production wells in sandstone reservoirs with big bottom water is understood. It evaluates the ultimate recovery of sandstone reservoirs with big bottom water. It provides a fundamental theoretical basis and guidance for dynamic prediction and delicate potential tapping of sandstone reservoirs with big bottom water at a high water cut stage.


Open Physics ◽  
2018 ◽  
Vol 16 (1) ◽  
pp. 499-508
Author(s):  
Chuanzhi Cui ◽  
Zhongwei Wu ◽  
Zhen Wang ◽  
Jingwei Yang ◽  
Yingfei Sui

AbstractPredicting the productivity of fractured five-spot patterns in low permeability reservoirs at high water cut stages has an important significance for the development and optimization of reservoirs. Taking the reservoir heterogeneity and uneven distribution of the remaining oil into consideration, a novel method for predicting the transient productivity of fractured five-spot patterns in low permeability reservoirs at high water cut stages is proposed by using element analysis, the flow tube integration method, and the mass conservation principle. This new method is validated by comparing with actual production data from the field and the results of a numerical simulation. Also, the effects of related parameters on transient productivity are analyzed. The results show that increasing fracture length, pressure difference and reservoir permeability correspond to an increasing productivity. The research provides theoretical support for the development and optimization of fractured five-spot patterns at the high water cut stage.


2019 ◽  
Vol 12 (15) ◽  
Author(s):  
Wu Zhongwei ◽  
Cui Chuanzhi ◽  
Japan Trivedi ◽  
Li Rongtao ◽  
Tang Wenhao ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document