The effect of total maximum daily loads (TMDL) program on water quality improvement in the Geum River basin, Korea

2014 ◽  
Vol 57 (2) ◽  
pp. 597-609 ◽  
Author(s):  
Eun Jung Kim ◽  
Yong Seok Kim ◽  
Doug Hee Rhew ◽  
Bae Kyung Park
Author(s):  
Haixia Zheng ◽  
Stale Navrud ◽  
Shiran Shen

Payment for Environmental Services (PES) in the watershed has been widely adopted as an important policy instrument to compensate upstream water users for providing water quality improvement for the whole river basin. In this paper, we use three independent valuation methods to determine the price of ecosystem service (ES), particularly water quality, in Miyun Reservoir, the main surface water source for Beijing. We find that the value of water quality is lowest using opportunity cost of limitation of development rights (OCLDR), highest with contingent valuation method (CVM), and water resources benefits assessment (WRBA) gives an in-between value. OCLDR determines the size of subsidies from those that benefit from water quality improvement from upstream. WRBA is a reference for compensation criteria to the upstream government and farmers when water resources are transferred across jurisdictional boundaries. CVM not only captures the direct value of water quality improvement, but also the indirect value of improvement in other ecosystem services as a result of improvement in water quality. Based on the results, we propose a multi-level ecological compensation system for the Miyun Reservoir river basin. We use OCLDR to determine subsides/ compensation to upstream farmers and other suppliers of the ES; WRBA set the price of water transfer; and CVM to figure out the size of payments for integrated water quality improvement.


2007 ◽  
Vol 55 (1-2) ◽  
pp. 367-374 ◽  
Author(s):  
S.J. Ki ◽  
Y.G. Lee ◽  
S.-W. Kim ◽  
Y.-J. Lee ◽  
J.H. Kim

This paper delivers two issues: water quality in the Yeongsan (YS) watershed which is one of the major watersheds in Korea and new watershed management plans with respect to the total maximum daily loads (TMDL) management. Field studies were conducted to estimate the pollutant loads according to the spatial and temporal distribution based on the biochemical oxygen demand (BOD) concentration and the volumetric flow rate (VFR) data from YS watershed. The results of both spatial and temporal analyses show the main pollutant source was originated from the city of Gwangju and the pollutant load from the city to YS watershed was the most out of five cities during this study period. Concerning YS reservoir located downstream of YS watershed, it also shows the worst water quality in the entire watershed during the study period. These results collectively demonstrate that the city of Gwangju is a main region which generates numerous point and non-point pollutant sources and eventually the pollutants are accumulated in YS reservoir. Based on the results, we suggest two different management plans for YS watershed. One is the flow-control approach that is to increase the amount of dam discharge in order to guarantee the river management flow for the midstream region. The other is the mass-control approach that is to dredge the contaminated sediments in YS reservoir for removing pollutants chronically accumulated in the sediment. Simulations for the former and the latter provide the pollution mitigation rate in the watershed up to 6 and 8% for BOD5, respectively. The methodology proposed here for TMDL management can be applied to a wide range of watersheds in Korea.


2009 ◽  
Vol 6 (1-3) ◽  
pp. 12-17 ◽  
Author(s):  
Bae Kyung Park ◽  
Jae Hong Park ◽  
Seung Young Oh ◽  
Dong Soo Kong ◽  
Doug Hee Rhew ◽  
...  

Author(s):  
Haixia Zheng ◽  
Stale Navrud ◽  
Shiran Shen

Payment for Environmental Services (PES) in the watershed has been widely adopted as an important policy instrument to compensate upstream water users for providing water quality improvement for the whole river basin. In this paper, we use three independent valuation methods to determine the price of ecosystem service (ES), particularly water quality, in Miyun Reservoir, the main surface water source for Beijing. We find that the value of water quality is lowest using opportunity cost of limitation of development rights (OCLDR), highest with contingent valuation method (CVM), and water resources benefits assessment (WRBA) gives an in-between value. OCLDR determines the size of subsidies from those that benefit from water quality improvement from upstream. WRBA is a reference for compensation criteria to the upstream government and farmers when water resources are transferred across jurisdictional boundaries. CVM not only captures the direct value of water quality improvement, but also the indirect value of improvement in other ecosystem services as a result of improvement in water quality. Based on the results, we propose a multi-level ecological compensation system for the Miyun Reservoir river basin. We use OCLDR to determine subsides/ compensation to upstream farmers and other suppliers of the ES; WRBA set the price of water transfer; and CVM to figure out the size of payments for integrated water quality improvement.


Sign in / Sign up

Export Citation Format

Share Document