scholarly journals Comparison of Topsis Comprehensive Evaluation System and Computer BP Neural Network Simulation

2021 ◽  
Vol 1952 (4) ◽  
pp. 042031
Author(s):  
Yongjun Fan ◽  
Yijie Liu ◽  
Yunmeng Xing ◽  
Wenxuan Liu
2015 ◽  
Vol 731 ◽  
pp. 401-406
Author(s):  
Rui Ting Pei ◽  
Hong Chen

<p>With the increasingly serious environmental problems, how to achieve the sustainable development of environment and economic has become a widespread concern at home and abroad. Through the research and analysis of clean production and clean production evaluation index system of domestic and foreign, and according to statistical theory, the reasonable and effective sampling method was determined. By researching the printing equipment manufacture and equipment applied enterprise of domestic, the data contained printing equipment energy use, emissions and product characteristic was obtained. By using the method of expert advice and factor analysis, clean production evaluation indicators and index system was determined.</p>


1993 ◽  
Vol 1 ◽  
pp. 121-134
Author(s):  
Masahiko KUNISHIMA ◽  
Tsunemi WATANABE ◽  
Hyun Yang SHIN ◽  
Masahide HORITA

2010 ◽  
Vol 168-170 ◽  
pp. 2376-2381
Author(s):  
Xi Jing Qi ◽  
Xiao Hu Zhou ◽  
Ming Liang Song ◽  
Feng Ming Li

High-rise buildings in China has developed rapidly in recent years and problems such as construction and vertical transportation have been paid close attention more and more by society. The safety project management objective system mentioned in this article has comprehensively considered the characteristics of high-rise construction and vertical transportation and provided a comprehensive evaluation system for vertical transportation equipment for high-rise construction, which may be used for guiding equipment selection and optimization of equipment use. Meanwhile, the study results are applied in practical project to verify its effectiveness and practicability, so as to guide the enterprises to reasonably select and use vertical transportation equipment for high-rise construction and to realize the integration benefits of the project.


Sign in / Sign up

Export Citation Format

Share Document