scholarly journals Using Earned Value Management with exponential smoothing technique to forecast project cost

2021 ◽  
Vol 1955 (1) ◽  
pp. 012101
Author(s):  
Mengyuan Zhao ◽  
Xuemin Zi

Forecasting construction project duration for future with accurate efficiency by considering all the delay factors is a big deal. Various examinations have been done to evaluate the reasons for duration delays in a construction site. Most common similarity between many factors are flawed design, inadequate supervision in workplace, shortage of supplies, absence of teamwork and local climatic conditions, causes a myriad of issues. Here, for forecasting, we chose the construction of ROB project at Kurnool, Andhra Pradesh. Though many techniques have been implemented to solve out this problem, predicting completion of an ongoing project is a big deal. Various tools have been used such as earned value management, exponential smoothing technique. After applying these techniques, a comparison with a minimal percentage of error is made and the best tool for prediction is selected. This investigation prescribes Smoothing techniques, the results become better when compared with different procedures.


2021 ◽  
pp. 1-14
Author(s):  
Seyed Taha Hossein Mortaji ◽  
Siamak Noori ◽  
Morteza Bagherpour

Earned value management is well-known as the most efficient method of project monitoring and control providing relatively reliable information about the project performance. However, this method requires accurate estimates of the progress of project activities, which are always associated with uncertainties that, if ignored or not addressed well, lead to incorrect results. To address this issue, the application of multi-valued logic, in particular fuzzy logic, in earned value management has recently attracted a lot of attention both in practice and research. This paper introduces directed earned value management (DEVM) in which ordered fuzzy numbers are used to express the so-called uncertainties as well as to capture more information about the trend of the project progress. To evaluate the performance of the proposed method, several numerical examples and a case study are presented. The results reveal that compared to the existing methods, DEVM has a lower computational complexity. Also, it doesn’t suffer from the overestimation effect and as a result, it has a higher ability to express project-specific dynamics. In sum, the proposed method allows project managers to make informed decisions that lead to taking preventive and corrective actions promptly and at a lower cost.


Sign in / Sign up

Export Citation Format

Share Document