Combining Activity‐based Costing and Process Mapping: A Practical Study

1993 ◽  
Vol 4 (4) ◽  
pp. 10-17 ◽  
Author(s):  
B.M. Amsler ◽  
J.S. Busby ◽  
G.M. Williams
2020 ◽  
Vol 11 ◽  
pp. 215145932095820
Author(s):  
Breanna L. Blaschke ◽  
Harsh R. Parikh ◽  
Sandy X. Vang ◽  
Brian P. Cunningham

Geriatric hip fractures are a common and costly injury. They are expected to surge in incidence and economic burden as the population ages. With an increasing financial strain on the healthcare system, payors and providers are looking toward alternative, value-based models to contain costs. Value in healthcare is the ratio of outcomes achieved over costs incurred, and can be improved by reducing cost while maintaining or improving outcomes, or by improving outcomes while maintaining or reducing costs. Therefore, an understanding of cost, the denominator of the value equation, is essential to value-based healthcare. Because traditional hospital accounting methods do not link costs to conditions, there has been little research to date on the costs of treating geriatric hip fractures over the entire cycle of care. The aim of this article is to summarize existing costing methodologies, and in particular, to review the strengths and limitations of Time-Driven Activity-Based Costing (TDABC) in orthopaedic trauma, especially as it pertains to the needs and challenges unique to hip fracture care. TDABC determines costs at the patient-level over the entire care cycle, allowing for population variability, while simultaneously identifying cost drivers that might inform risk-stratification for future alternative payment models. Through process mapping, TDABC also reveals areas of variation or inefficiency that can be targeted for optimization, and empowers physicians by focusing on costs in the control of the provider. Although barriers remain, TDABC is well-positioned to provide transparent costing and targets to improve the value of hip fracture care


2013 ◽  
Vol 31 (31_suppl) ◽  
pp. 196-196
Author(s):  
Alexis Barboza ◽  
Elizabeth Rebello ◽  
Heidi Wied Albright ◽  
Johnny Dang ◽  
Jennifer Jones ◽  
...  

196 Background: The aim of the project was to use anesthesia providers in a cancer center to lead process improvements using time-driven activity-based costing (TDABC), a system of measuring process and capacity costs. Methods: The process improvement objectives were centered on eliminating unnecessary patient care processes and improving patient flow. Teams were tasked with planning, process mapping, improving processes, and measuring costs. Projects were done in four anesthesia sites: ambulatory surgery, bone marrow aspiration, pediatric CT and XRT, and cardiopulmonary areas. Results: Process mapping identified areas for improvement and costs before and after the improvement. The Table highlights four project areas’ average total cost and time savings per patient using TDABC methodology. Conclusions: TDABC is a costing methodology that measures the costs of care utilizing process maps. Anesthesia providers had front-line insight in improving process flow and found the process mapping useful to improve processes and measure the cost savings of the improvement. In each area there was improvement or no adverse effect on patient outcomes. This project demonstrates that TDABC illustrates inefficiencies and provides a method to evaluate the cost savings of process improvements. As cancer care reimbursement evolves, the ability to control costs while providing value-based care is essential. [Table: see text]


1996 ◽  
Vol 13 (1) ◽  
pp. 73-88
Author(s):  
James D. Cashell ◽  
Anthony H. Presutti

2020 ◽  
Vol 6 (1) ◽  
pp. 18-39
Author(s):  
Areena Zaini ◽  
Haryantie Kamil ◽  
Mohd Yazid Abu

The Electrical & Electronic (E&E) company is one of Malaysia’s leading industries that has 24.5% in manufacturing sector production. With a continuous innovation of E&E company, the current costing being used is hardly to access the complete activities with variations required for each workstation to measure the un-used capacity in term of resources and cost. The objective of this work is to develop a new costing structure using time-driven activity-based costing (TDABC) at . This data collection was obtained at E&E company located at Kuantan, Pahang that focusing on magnetic component. The historical data was considered in 2018. TDABC is used to measure the un-used capacity by constructing the time equation and capacity cost rate. This work found three conditions of un-used capacity. Type I is pessimistic situation whereby according to winding toroid core, the un-used capacity of time and cost are -14820 hours and -MYR2.60 respectively. It means the system must sacrifice the time and cost more than actual apportionment. Type II is most likely situation whereby according to assembly process, the un-used capacity of time and cost are 7400 hours and MYR201575.45 respectively. It means the system minimize the time and cost which close to fully utilize from the actual apportionment. Type III is optimistic situation whereby according to alignment process, the un-used capacity of time and cost are 4120 hours and MYR289217.15 respectively. It means the system used small amount of cost and time from the actual apportionment.


Controlling ◽  
2004 ◽  
Vol 16 (11) ◽  
pp. 597-602 ◽  
Author(s):  
Werner Bruggeman ◽  
Kris Moreels

Sign in / Sign up

Export Citation Format

Share Document