Highway Road Widening Construction Technology Based on Short-Distance Sensing Technology

Author(s):  
Lili Zhou
2011 ◽  
Vol 255-260 ◽  
pp. 3272-3276
Author(s):  
Liang Fan ◽  
Zhi Xiang Zhou

In view of good geological condition non-cliff side slope road widening or new road construction, after contrasting and analyzing the characteristics of widening pattern of roads that have been built, lattice slope foundation cantilever structure complex road is proposed. Using slope foundation column which is casted depending on hillside, its top connect with deck of bridge supporting on the cantilever beam ,thus forms the flank roadway structure. This complex road can avoid deep-digging and high filling, lower construction cost.The construction method is simple, slope is also stable. Moreover, in the course of road widening, vehicle traffic will basically not be affected. In this paper, the method of construction technology, working principles, engineering application and economic, technical efficiency and environmental effectiveness have been analyzed, it shows that in road widening under appropriate condition, this method is safe and reliable, can significantly simplify the process, lower cost, and also maximize the protection of natural ecological environment.


2018 ◽  
Vol 7 (1) ◽  
pp. 51-60
Author(s):  
Fitri Wulandari ◽  
Nirwana Puspasari ◽  
Noviyanthy Handayani

Jalan Temanggung Tilung is a 2/2 UD type road (two undirected two-way lanes) with a road width of 5.5 meters, which is a connecting road between two major roads, namely the RTA road. Milono and the path of G. Obos. Over time, the volume of traffic through these roads increases every year, plus roadside activities that also increase cause congestion at several points of the way. To overcome this problem, the local government carried out road widening to increase the capacity and level of road services. The study was conducted to determine the amount of traffic volume, performance, service level of the Temanggung Tilung road section at peak traffic hours before and after road widening. Data retrieval is done by the direct survey to the field to obtain primary data in the form of geometric road data, two-way traffic volume data, and side obstacle data. Performance analysis refers to the 1997 Indonesian Road Capacity Manual (MKJI) for urban roads. From the results of data processing, before increasing the road (Type 2/2 UD), the traffic volume that passes through the path is 842 pcs/hour and after road widening (Type 4/2 UD) the traffic volume for two directions is 973 pcs/hour, with route A equaling 528 pcs/hour and direction B equaling 445 pcs/hour. Based on the analysis of road performance before road enhancement, the capacity = 2551 pcs/hour, saturation degree = 0.331, and the service level of the two-way road are level B. Based on the analysis of the performance of the way after increasing the way, the direction capacity A = 2686 pcs/hour and direction B = 2674 pcs /hour, saturation degree for direction A = 0.196 and direction B = 0.166, service level for road direction A and direction B increase to level A


CIM Journal ◽  
2019 ◽  
Vol 10 (1) ◽  
Author(s):  
D. Beneteau ◽  
D. Milne ◽  
L. Feldman ◽  
G. Snell ◽  
A. Hyett

Sign in / Sign up

Export Citation Format

Share Document