Techno-Economic Optimization of a Combined Cycle Combined Heat and Power Plant With Integrated Heat Pump and Low-Temperature Thermal Energy Storage

2021 ◽  
Author(s):  
Jose Angel Garcia ◽  
Vincent Smet ◽  
Rafael Gu\xe3\xa9Dez ◽  
Alessandro Sorce
2010 ◽  
Vol 4 (4) ◽  
pp. 469-474 ◽  
Author(s):  
Weilong Wang ◽  
Yukun Hu ◽  
Jinyue Yan ◽  
Jenny Nyström ◽  
Erik Dahlquist

Energies ◽  
2020 ◽  
Vol 13 (11) ◽  
pp. 2733 ◽  
Author(s):  
Roberto Tascioni ◽  
Alessia Arteconi ◽  
Luca Del Zotto ◽  
Luca Cioccolanti

Latent heat thermal energy storage (LHTES) systems allow us to effectively store and release the collected thermal energy from solar thermodynamic plants; however, room for improvements exists to increase their efficiency when in operation. For this reason, in this work, a smart management strategy of an innovative LHTES in a micro-scale concentrated solar combined heat and power plant is proposed and numerically investigated. The novel thermal storage system, as designed and built by the partners within the EU funded Innova MicroSolar project, is subdivided into six modules and consists of 3.8 tons of nitrate solar salt kNO3/NaNO3, whose melting temperature is in the range 216 ÷ 223 °C. In this study, the partitioning of the storage system on the performance of the integrated plant is evaluated by applying a smart energy management strategy based on a fuzzy logic approach. Compared to the single thermal energy storage (TES) configuration, the proposed strategy allows a reduction in storage thermal losses and improving of the plant’s overall efficiency especially in periods with limited solar irradiance. The yearly dynamic simulations carried out show that the electricity produced by the combined heat and power plant is increased by about 5%, while the defocus thermal losses in the solar plant are reduced by 30%.


Author(s):  
Jose Garcia ◽  
Vincent Smet ◽  
Rafael Guedez ◽  
Alessandro Sorce

Abstract The present study presents a techno-economic analysis of a novel power plant layout developed to increase the dispatch flexibility of a Combined Cycle Gas Turbine (CCGT) coupled to a District Heating Network (DHN). The layout includes the incorporation of high temperature heat pumps (HP) and thermal energy storage (TES). A model for optimizing the short-term dispatch strategy of such system has been developed to maximize its operational profit. The constraints and boundary conditions considered in the study include hourly demand and price of electricity and heat, ambient conditions and CO2 emission allowances. To assess the techno-economic benefit of the new layout, a year of operation was simulated for a power plant in Turin, Italy. Furthermore, different layout configurations and critical size-related parameters were considered. Finally, a sensitivity analysis was made to assess the performance under different market scenarios. The results show that it is indeed beneficial, under the assumed market conditions, to integrate a HP in a CCGT plant coupled to a DHN, and that it remains profitable to do so under a variety of market scenarios. The best results for the assumed market conditions were found when integrating a 15 MWth capacity HP in the 400 MWel CCGT-CHP. For this case study, the investment in the HP would yield a net present value (NPV) of 1.22 M€ and an internal rate of return (IRR) of 3.04% for a lifetime of 20 years. An increase was shown also in operational flexibility with 0.14% of the electricity production shifted while meeting the same heating demand. Additionally, it was found that the TES makes the system even more flexible, but does not make up for the extra investment.


Sign in / Sign up

Export Citation Format

Share Document