Qassim Central Power Plant Inlet Air Cooling System
Keyword(s):
Start Up
◽
This paper summarizes the experiences with the first gas turbine inlet air cooling project in Saudi Arabia. It will cover the feasibility study, cooling system options, overview, system equipment description, process flow diagram, construction, commissioning, start-up and performance of the project which is currently under commissioning and initial start up at Qassim Central Power Plant (QCPP) owned by Saudi Electric Company (S.E.C.) Central Region Branch.
2019 ◽
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
2016 ◽
Vol 5
(2)
◽
pp. 859-865
Keyword(s):
2007 ◽
Vol 46
(3)
◽
pp. 308-317
◽
Keyword(s):