scholarly journals An Analysis of Power Enhancement of Gas Turbine Power Plant Using Different Types of Air Cooling System

2016 ◽  
Vol 5 (2) ◽  
pp. 859-865
Author(s):  
Farshid Zabihian ◽  
Alan S. Fung ◽  
Fabio Schuler

Gas turbine-based power plants are very sensitive to ambient conditions and their output power and efficiency can be decreased significantly with increase in the ambient temperature. Various compressor inlet air cooling systems have been proposed and utilized to reduce inlet air temperature to the system, including evaporative systems e.g. media and fogging, and mechanical cooling systems. In this work, different techniques for compressor inlet air cooling are briefly reviewed. Then, the fogging system employed in the Whitby cogeneration power plant is explained with particular attention to the location of the system installation. A model of the gas turbine-based cogeneration plant is also developed to simulate the Whitby cogeneration power plant. The effects of fogging compressor inlet air cooling system on the performance of the plant are investigated. The results indicate that at an ambient temperature of 30°C and relative humidity of 40% the inlet cooling of as high as 8.4°C is possible which can increase output power to more than 50 MW. Also, it is found that the model can predict the gas turbine exhaust temperature and the plant’s power production with the error level of lower than 0.5% and 3%, respectively.


Volume 1 ◽  
2004 ◽  
Author(s):  
Mohammad Ameri ◽  
Hamid Nabati ◽  
Alireza Keshtgar

Gas turbines are almost constant volume machines at a specific rotating speed, i.e., air intake is limited to a nearly fixed volume of air regardless of ambient air conditions. As air temperature rises, its density falls. Thus, although the volumetric flow rate remains constant, the mass flow rate is reduced as air temperature rises. Power output is also reduced as air temperature rises because power output is proportional to mass flow rate. This power output reduction is from 0.5% to 0.9% of the ISO output power for every 1°C rise in the ambient temperature. The solution of this problem is very important because the peak demand season also happens in the summer. One of the useful methods to overcome this problem is to apply the fog inlet air cooling system for the gas turbines. In this paper the Rey Power Plant site climate conditions in the summer have been studied. The design conditions regarding the dry bulb temperature and relative humidity have been selected. The different inlet air cooling systems have been studied and the Fog system has been chosen. The economical study has shown that this system is very cheap in comparison with the installation of the new gas turbines. The capital cost is estimated to be 40 $/KW. The pay back period is around 1.5 year. The testing of this system has shown that the average power capacity of the power plant is increased by 19 MW and prevented the installation of a new gas turbine.


Author(s):  
Paul Shaw ◽  
Farshid Zabihian ◽  
Alan S. Fung

This paper presents results of the combined cycle power plant (CCPP) modeling when the ambient temperature is varying. The model of the CCPP was developed using a gas turbine and a heat recovery steam generator (HRSG) models that had been already developed and validated. The model of the components was developed based on an actual existing power plant and then the operational data of the power plant was used to validate the model. The results of running the model for various ambient temperatures demonstrated that the performance of the gas turbine part of the cycle was heavily affected by the changes in the ambient temperature, particularly the output power of the gas turbines. However, the performance of the steam cycle was almost untouched by the changes of ambient temperature. This suggests that operation of the CCPP is more stable than stand-alone gas turbine in hot summer days especially if the cycle is not equipped with an inlet air cooling system.


Author(s):  
A. Al Bassam ◽  
Y. M. Al Said

This paper summarizes the experiences with the first gas turbine inlet air cooling project in Saudi Arabia. It will cover the feasibility study, cooling system options, overview, system equipment description, process flow diagram, construction, commissioning, start-up and performance of the project which is currently under commissioning and initial start up at Qassim Central Power Plant (QCPP) owned by Saudi Electric Company (S.E.C.) Central Region Branch.


Author(s):  
Motoaki Utamura ◽  
Yoshio Nishimura ◽  
Akira Ishikawa ◽  
Nobuo Ando

A cost estimate method is presented, which enables to compare inlet air cooling system for power enhancement of combustion turbine with other power generation system. A new energy conversion index is developed which arranges system design parameters in a dimensionless form and also exhibits running cost. It is suggested that the inlet air cooling system is equivalent to simple cycle or pumped storage in view of the dimensionless running cost. Next, a cost diagram relating capital cost to power generation cost is presented also in non-dimensional form, which could provide a measure to examine investment worth for a power producer. Moreover, cooling effectiveness as function of cooled inlet air temperature is investigated using specific thermal energy. It is revealed that cooling beyond dew point requires a larger thermal energy per electric energy produced and thus less economical unless the price of electricity depends on electricity demand.


2018 ◽  
Vol 225 ◽  
pp. 01020
Author(s):  
Thamir K. Ibrahim ◽  
Mohammed K. Mohammed ◽  
Omar I. Awad ◽  
Rizalman Mamat ◽  
M. Kh Abdolbaqi

A basic goal of operation management is to successfully complete the life cycle of power systems, with optimum output against minimal input. This document intends calculating both, the performance and the life cycle cost of a gas turbine fitted with an inlet air cooling mechanism. Correspondingly, both a thermodynamic and an economic model are drawn up, to present options towards computing the cooling loads and the life cycle costs. The primary observations indicate that around 120MWh of power is derived from gas turbine power plants incorporating the cooling mechanism, compared to 96.6 MWh for units without the mechanism, while the life cycle cost is lower for units incorporating the cooling process. This indicates benefits in having the mechanism incorporated in the architecture of a gas turbine.


Author(s):  
Hiroyuki Yamazaki ◽  
Yoshiaki Nishimura ◽  
Masahiro Abe ◽  
Kazumasa Takata ◽  
Satoshi Hada ◽  
...  

Tohoku Electric Power Company, Inc. (Tohoku-EPCO) has been adopting cutting-edge gas turbines for gas turbine combined cycle (GTCC) power plants to contribute for reduction of energy consumption, and making a continuous effort to study the next generation gas turbines to further improve GTCC power plants efficiency and flexibility. Tohoku-EPCO and Mitsubishi Hitachi Power Systems, Ltd (MHPS) developed “forced air cooling system” as a brand-new combustor cooling system for the next generation GTCC system in a collaborative project. The forced air cooling system can be applied to gas turbines with a turbine inlet temperature (TIT) of 1600deg.C or more by controlling the cooling air temperature and the amount of cooling air. Recently, the forced air cooling system verification test has been completed successfully at a demonstration power plant located within MHPS Takasago Works (T-point). Since the forced air cooling system has been verified, the 1650deg.C class next generation GTCC power plant with the forced air cooling system is now being developed. Final confirmation test of 1650deg.C class next generation GTCC system will be carried out in 2020.


Sign in / Sign up

Export Citation Format

Share Document