Management of Radioactive Waste and Materials Arising From the Decommissioning of Italian Nuclear Power Plants

Author(s):  
Gaetano Ruggeri ◽  
Luigi Brusa

Abstract Scope of the paper is to summarise the experience about management of materials arising from decommissioning of Italian NPPs, and to illustrate criteria, procedures and systems, which Sogin is defining to manage the problem of the clearance of sites and materials, considering the international experience and boundary conditions existing in the Country. Since 1962 Enel (the largest Italian utility for electric power) has operated the four Italian nuclear power plants: Garigliano (160 MWe BWR), Latina (210 MWe GCR), Trino (270 MWe PWR) and Caorso (882 MWe BWR). These NPPs were shutdown in the 80’s: Garigliano NPP was shutdown in 1982 following a decision made by Enel, based on technical and economical reasons, Latina, Trino and Caorso NPPs following decisions made by the Italian Government after the Chernobyl accident. The “deferred decommissioning (SAFSTOR)” was the decommissioning strategy selected by Enel and approved by the competent Authorities, due to the lack of a repository for the disposal of radioactive materials and of release limits for clearance of materials. Activities have been started aimed at reaching the “Safe Enclosure” condition, which would have lasted for some decades, before final dismantling of plants. In 1999 the liberalisation of the Italian electricity market led Enel to separate its nuclear activities, forming a new Company, named Sogin, to which decommissioning Italian NPPs was committed. At the same time, considering pressures, both at national and local level, to adopt the “prompt decommissioning (DECON)” strategy, in December 1999 the Italian Minister of Industry, with the intent to accelerate the dismantling of Italian NPPs, presented the plans to create a national repository for nuclear waste, and asked Sogin to revise the decommissioning plans, according to the new global strategy, taking into account all the relevant technical, organisational, financial and legislative aspects of the problem. As the DECON strategy enhances the importance of “clean-up” both of sites and materials, the related aspects are held in due consideration in developing the decommissioning plans, which deal with the following: • characterisation of plant systems, components and structures; • decontamination and dismantling techniques; • monitoring of dismantled materials for clearance; • treatment of dismantled, radioactive materials (which cannot be cleared), prior to disposal; • treatment and conditioning of radioactive waste, prior to disposal; • final clearance of sites. Authorisation requirement related to the release, recycle and reuse of materials produced during plant decommissioning, together with the acceptance criteria for disposal of radioactive materials, are of key importance, considering that the change in decommissioning strategy increases the quantity of radioactive waste to be disposed of, the costs for waste treatment, transportation and disposal, and the capacity of the national repository. In this connection, Sogin is discussing with competent Authorities and Bodies in order to define clearance criteria and disposal acceptance criteria, which neither impair nor complicate the future dismantling operations. In (1) details are given about Italian decommissioning Regulation, decommissioning strategy and Organisation, in order to show the boundary conditions, which exist in Italy for planning and development of NPPs Decommissioning Projects. In the following paragraphs the decommissioning strategy is summarised first together with some critical items of decommissioning; then the Italian regulation about the management of radioactive waste is reported. The management of waste and materials, which will arise from the decommissioning of Italian nuclear power plants, is driven by the requirements imposed by the competent Authorities basing on this regulation.

Author(s):  
Takeshi Ishikura ◽  
Daiichiro Oguri

Abstract Minimizing the volume of radioactive waste generated during dismantling of nuclear power plants is a matter of great importance. In Japan waste forms buried in shallow burial disposal facility as low level radioactive waste (LLW) must be solidified by cement with adequate strength and must extend no harmful openings. The authors have developed an improved method to minimize radioactive waste volume by utilizing radioactive concrete and metal for mortar to fill openings in waste forms. Performance of a method to pre-place large sized metal or concrete waste and to fill mortar using small sized metal or concrete was tested. It was seen that the improved method substantially increases the filling ratio, thereby decreasing the numbers of waste containers.


Author(s):  
Juyoul Kim ◽  
Sukhoon Kim ◽  
Jin Beak Park ◽  
Sunjoung Lee

In the Korean LILW (Low- and Intermediate-Level radioactive Waste) repository at Gyeongju city, the degradation of organic wastes and the corrosion of metallic wastes and steel containers would be important processes that affect repository geochemistry, speciation and transport of radionuclides during the lifetime of a radioactive waste disposal facility. Gas is generated in association with these processes and has the potential threat to pressurize the repository, which can promote the transport of groundwater and gas, and consequently radionuclide transport. Microbial activity plays an important role in organic degradation, corrosion and gas generation through the mediation of reduction-oxidation reactions. The Korean research project on gas generation is being performed by Korea Radioactive Waste Management Corporation (hereafter referred to as “KRMC”). A full-scale in-situ experiment will form a central part of the project, where gas generation in real radioactive low-level maintenance waste from nuclear power plants will be done as an in-depth study during ten years at least. In order to examine gas generation issues from an LILW repository which is being constructed and will be completed by the end of December, 2012, two large-scale facilities for the gas generation experiment will be established, each equipped with a concrete container carrying on 16 drums of 200 L and 9 drums of 320 L of LILW from Korean nuclear power plants. Each container will be enclosed within a gas-tight and acid-proof steel tank. The experiment facility will be fully filled with ground water that provides representative geochemical conditions and microbial inoculation in the near field of repository. In the experiment, the design includes long-term monitoring and analyses for the rate and composition of gas generated, and aqueous geochemistry and microbe populations present at various locations through on-line analyzers and manual periodical sampling. A main schedule for establishing the experiment facility is as follows: Completion of the detailed design until the second quarter of the year 2010; Completion of the manufacture and on-site installation until the second quarter of the year 2011; Start of the operation and monitoring from the third quarter of the year 2011.


2002 ◽  
Vol 13 (2) ◽  
pp. 239-261
Author(s):  
Steve Thomas

In 1990, the privatisation of the British electricity supply industry revealed how uneconomic Britain's nuclear power plants were. The nuclear sector was withdrawn from privatisation and it seemed likely that by 2000, most of Britain's nuclear power plants would be closed. However, operating costs were dramatically reduced and in 1996, most of the nuclear plants were privatised in British Energy. Nuclear output made an important contribution to the reduction of greenhouse gas emissions and the future looked secure for the existing plants. However, the early success of British Energy was based on an inflated wholesale electricity price and by 2000, British Energy was struggling to cover its costs. The British government is now conducting a review of energy policy. The economic case for new nuclear power plants is poor but the need to meet greenhouse gas emission targets and the influence British Energy and BNFL may ensure the long-term future of the existing plants.


1985 ◽  
Vol 50 ◽  
Author(s):  
I. B. Plecas ◽  
Li. L. Mihajlovic ◽  
A. M. Kostadinovic

AbstractIn this paper an optimization of concrete container composition, used for storing low and intermediate level radioactive waste from nuclear power plants in Yugoslavia, is presented.Mechanical properties 37−52 MPa, permeability 1.07. 10−13 - 1.50. 10−11cm2 and leakage rate 3.66. 10−6 - 1.77. 10−4 cm/d for concrete made of commercial materials, were tested.


1981 ◽  
Vol 11 ◽  
Author(s):  
Roger Thunvik ◽  
Carol Braester

The possibility of permanent burial of radioactive waste from nuclear power plants, is studied in Sweden at the KBS (Nuclear Fuel Safety) - project. Definite repository sites have not yet been selected, but the general principles of construction regarding the layout have been devised (KBS).


Sign in / Sign up

Export Citation Format

Share Document