Last Developments About Spent Fuel Management in Belgium

Author(s):  
V. Wittebolle

Abstract In Belgium 57% of the electricity is presently generated by 7 nuclear units of the PWR type located in Doel and Tihange. Their total output amounts to 5632 MWe. Part of the spent fuel unloaded from the first three units has been sent till 2000 for reprocessing in the Cogema facility at La Hague. As the reprocessing of the spent fuel produced by the last four units is not covered by the contracts concluded with Cogema, Synatom, the Belgian utilities’ subsidiary in charge of the front- and back-end of the nuclear fuel cycle for all PWR reactors in Belgium, decided to study the possible solutions for a temporary storage of this spent fuel. End of 1993, the Belgian government decided that reprocessing (closed cycle) and direct disposal (open cycle) of spent fuel had to be considered as equal options in the back-end policy for nuclear fuel in Belgium. The resolution further allowed continued execution of a running reprocessing contract (from 1978) and use of the corresponding Pu for MOX in Belgian NPP’s, but requested a reprocessing contract concluded in 1990 (for reprocessing services after 2000) not to be executed during a five-year period. During this period priority was to be given to studies on the once-through cycle as an option for spent fuel management. Figure 1 is a chart showing the two alternatives for the spent fuel cycle in Belgium. In this context, Synatom entrusted Belgatom1 to develop a dedicated flask (called “bottle”) for direct disposal of spent fuel, to perform a design study of an appropriate encapsulation process and to prepare a preliminary feasibility study of a complete spent fuel conditioning plant. Meanwhile preparation works were made for the construction of an interim storage facility on both NPP sites of Doel and Tihange in order to meet increasing storage capacity needs. For selecting the type of interim storage facility, Belgatom performed a technical-economical analysis. Considerations of design and safety criteria as well as flexibility, reversibility, technical constraints, global economical aspects and construction time led to adopt dry storage with dual purpose casks (in operation since end 1995) for the Doel site and wet storage in a modular pool for the Tihange site (in operation since 1997). In parallel, ONRAF/NIRAS, the Belgian Agency for the management of radioactive waste and enriched fissile materials and the Belgian nuclear research centre, SCK•CEN, conduct underground investigations in view of geological disposal. The paper describes the methodology that Belgatom has developed to provide the utilities with appropriate solutions (reracking, dry storage in casks, wet storage in ponds, etc.) and how Belgatom demonstrated also the feasibility of spent fuel conditioning with a view to direct disposal in clay layers. The spent fuel storage facilities in operation in Belgium and designed and built by Belgatom are then briefly presented.

Author(s):  
Michel De Valkeneer ◽  
Michel Detilleux ◽  
Guy Nuyt ◽  
Jean-Pierre Fabry ◽  
Guy Demazy ◽  
...  

Abstract In Belgium 57% of the electricity is presently generated by 7 nuclear units of the PWR type located in Doel and Tihange. Their total output amounts to 5632 MWe. Part of the spent fuel unloaded from the first three units has been sent till 2000 for reprocessing in the Cogema facility at La Hague. As the reprocessing of the spent fuel produced by the last four units is not covered by the contracts concluded with Cogema, Synatom, the Belgian utilities’ subsidiary in charge of the front- and back-end of the nuclear fuel cycle for all PWR reactors in Belgium, decided to study the possible solutions for a temporary storage of this spent fuel. End of 1993, the Belgian government decided that reprocessing (closed cycle) and direct disposal (open cycle) of spent fuel had to be considered as equal options in the back-end policy for nuclear fuel in Belgium. The resolution further allowed continued execution of a running reprocessing contract (from 1978) and use of the corresponding Pu for MOX in Belgian NPP’s, but requested a reprocessing contract concluded in 1990 (for reprocessing services after 2000) not to be executed during a five-year period. During this period priority was to be given to studies on the once-through cycle as an option for spent fuel management. Figure 1 is a chart showing the two alternatives for the spent fuel cycle in Belgium. In this context, Synatom entrusted Belgatom to develop a dedicated flask (called “bottle”) for direct disposal of spent fuel, to perform a design study of an appropriate encapsulation process and to prepare a preliminary feasibility study of a complete spent fuel conditioning plant. Meanwhile preparation works were made for the construction of an interim storage facility on both NPP sites of Doel and Tihange in order to meet increasing storage capacity needs. For selecting the type of interim storage facility, Belgatom performed a technical-economical analysis. Considerations of design and safety criteria as well as flexibility, reversibility, technical constraints, global economical aspects and construction time led to adopt dry storage with dual purpose casks (in operation since end 1995) for the Doel site and wet storage in a modular pool for the Tihange site (in operation since 1997). In parallel, ONRAF/NIRAS, the Belgian Agency for the management of radioactive waste and enriched fissile materials and the Belgian nuclear research centre, SCK•CEN, conduct underground investigations in view of geological disposal. The paper describes the methodology that Belgatom has developed to provide the utilities with appropriate solutions (reracking, dry storage in casks, wet storage in ponds, etc.) and how Belgatom demonstrated also the feasibility of spent fuel conditioning with a view to direct disposal in clay layers. The spent fuel storage facilities in operation in Belgium, designed and built by Belgatom, are then briefly presented.


Author(s):  
Masumi Wataru ◽  
Hisashi Kato ◽  
Satoshi Kudo ◽  
Naoko Oshima ◽  
Koji Wada ◽  
...  

Spent nuclear fuel coming from a Japanese nuclear power plant is stored in the interim storage facility before reprocessing. There are two types of the storage methods which are wet and dry type. In Japan, it is anticipated that the dry storage facility will increase compared with the wet type facility. The dry interim storage facility using the metal cask has been operated in Japan. In another dry storage technology, there is a concrete overpack. Especially in USA, a lot of concrete overpacks are used for the dry interim storage. In Japan, for the concrete cask, the codes of the Japan Society of Mechanical Engineers and the governmental technical guidelines are prepared for the realization of the interim storage as well as the code for the metal cask. But the interim storage using the concrete overpack has not been in progress because the evaluation on the stress corrosion cracking (SCC) of the canister is not sufficient. Japanese interim storage facilities would be constructed near the seashore. The metal casks and concrete overpacks are stored in the storage building in Japan. On the other hand, in USA they are stored outside. It is necessary to remove the decay heat of the spent nuclear fuel in the cask from the storage building. Generally, the heat is removed by natural cooling in the dry storage facility. Air including the sea salt particles goes into the dry storage facility (Figure 1). Concerning the concrete overpack, air goes into the cask body and cools the canister. Air goes along the canister surface and is in contact with the surface directly. In this case, the sea salt in the air attaches to the surface and then there is the concern about the occurrence of the SCC. For the concrete overpack, the canister including the spent fuel is sealed by the welding. The loss of sealability caused by the SCC has to be avoided. To evaluate the SCC for the canister, it is necessary to make clear the amount of the sea salt particles coming into the storage building and the concentration on the canister. In present, the evaluation on that point is not sufficient. In this study, the concentration of the sea salt particles in the air and on the surface of the storage facility are measured inside and outside of the building. For the measurement, two sites of the dry storage facility using the metal cask are chosen. This data is applicable for the evaluation on the SCC of the canister to realize the interim storage using the concrete overpack.


MRS Advances ◽  
2018 ◽  
Vol 3 (19) ◽  
pp. 991-1003 ◽  
Author(s):  
Evaristo J. Bonano ◽  
Elena A. Kalinina ◽  
Peter N. Swift

ABSTRACTCurrent practice for commercial spent nuclear fuel management in the United States of America (US) includes storage of spent fuel in both pools and dry storage cask systems at nuclear power plants. Most storage pools are filled to their operational capacity, and management of the approximately 2,200 metric tons of spent fuel newly discharged each year requires transferring older and cooler fuel from pools into dry storage. In the absence of a repository that can accept spent fuel for permanent disposal, projections indicate that the US will have approximately 134,000 metric tons of spent fuel in dry storage by mid-century when the last plants in the current reactor fleet are decommissioned. Current designs for storage systems rely on large dual-purpose (storage and transportation) canisters that are not optimized for disposal. Various options exist in the US for improving integration of management practices across the entire back end of the nuclear fuel cycle.


Author(s):  
Donald Wayne Lewis

In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a “Monitored Retrievable Storage” facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to build a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE’s goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility.


Author(s):  
Tadahiro Katsuta

Political and technical advantages to introduce spent nuclear fuel interim storage into Japan’s nuclear fuel cycle are examined. Once Rokkasho reprocessing plant starts operation, 80,000 tHM of spent Low Enriched Uranium (LEU) fuel must be stored in an Away From Reactor (AFR) interim storage site until 2100. If a succeeding reprocessing plant starts operating, the spent LEU will reach its peak of 30,000 tHM before 2050, and then will decrease until the end of the second reprocessing plant operation. Throughput of the second reprocessing plant is assumed as twice of that of Rokassho reprocessing plant, indeed 1,600tHM/year. On the other hand, tripled number of final disposal sites for High Level Nuclear Waste (HLW) will be necessary with this condition. Besides, large amount of plutonium surplus will occur, even if First Breeder Reactors (FBR)s consume the plutonium. At maximum, plutonium surplus will reach almost 500 tons. These results indicate that current nuclear policy does not solve the spent fuel problems but rather complicates them. Thus, reprocessing policy could put off the problems in spent fuel interim storage capacity and other issues could appear such as difficulties in large amount of HLW final disposal management or separated plutonium management. If there is no reprocessing or MOX use, the amount of spent fuel will reach over 115,000 tones at the year of 2100. However, the spent fuel management could be simplified and also the cost and the security would be improved by using an interim storage primarily.


Author(s):  
Wolfgang Botsch ◽  
Silva Smalian ◽  
Peter Hinterding ◽  
Holger Völzke ◽  
Dietmar Wolff ◽  
...  

As with the storage of all radioactive materials, the storage of spent nuclear fuel (SF) and high-level radioactive waste (HLW) must conform to safety requirements. Safety aspects like safe enclosure of radioactive materials, safe removal of decay heat, nuclear criticality safety and avoidance of unnecessary radiation exposure must be achieved throughout the storage period. The implementation of these safety requirements can be achieved by dry storage of SF and HLW in casks as well as in other systems such as dry vault storage systems or spent fuel pools, where the latter is neither a dry nor a passive system. After the events of Fukushima, the advantages of passively and inherently safe dry storage systems have become more obvious. TÜV and BAM, who work as independent experts for the competent authorities, present the licensing process for sites and casks and inform about spent nuclear fuel management and issues concerning dry storage of spent nuclear fuel, based on their long experience in these fields. All safety relevant issues like safe enclosure, shielding, removal of the decay heat or behavior of cask and building under accident conditions are checked and validated with state-of-the-art methods and computer codes before the license approval. It is shown how dry storage systems can ensure the compliance with the mentioned safety criteria over a long storage period. Exemplarily, the process of licensing, erection and operation of selected German dry storage facilities is presented.


Author(s):  
Allan B. Christensen ◽  
Kenneth Custer ◽  
Rick Gardner ◽  
James Kaylor ◽  
James Stalnaker

In less than a year, up to 12 canisters of TMI-2 reactor fuel debris were loaded into each of 28 Dry Storage Containers (DSCs), and placed into interim storage at an Irradiated Spent Fuel Storage Facility (ISFSI) at the Idaho National Engineering and Environmental Laboratory (INEEL). Draining and drying the canisters, loading and welding the DSCs, shipping the DSCs 25 miles, and storing in the ISFSI initially required up to 3 weeks per DSC. Significant time efficiencies were achieved during the early stages, reducing the time to less than one week per DSC. These efficiencies were achieved mostly in canister draining and drying and DSC lid welding, and despite several occurrences that had to be resolved before continuing work. The ISFSI has been operated without issue since, with the exception that license basis monitoring has indicated an unusual pattern of season- and position-dependent hydrogen generation. This paper discusses some of the innovations and storage experiences for the first ISFSI designed for the storage of severely defected fuel.


Author(s):  
Justo Garcia ◽  
Hervé Issard

Nuclear reactors generate used nuclear fuel, which needs to be safely managed. After discharge from operating nuclear reactors, the used nuclear fuel stored during a certain period of time in reactor pool is removed for reprocessing, disposal, or storage elsewhere. A need for additional storage exists because of delays in used nuclear fuel disposition decisions and the continually increasing volume of used nuclear fuel discharged from reactors. Interim storage of used nuclear fuel is an essential part of the Nuclear Fuel Cycle providing nuclear safety and ensuring protection to the public. Interim storage of used nuclear fuel currently used includes: • Dry storage in vaults, casks and containers • Wet storage, in silos, pools, outside reactor operating areas Interim dry storage systems were originally designed for limited periods, generally 40–60 years. Interim dry storage is safe as shown by important industrial feedback and the operational records, even from severe accidents. With extended interim dry storage, technical and safety investigations are presently being carried out concerning used nuclear fuel behavior, and the storage structures and their system components to demonstrate and justify the ability of the systems to store safely and securely the used nuclear fuel for a much longer period of time. These investigations are part of the ageing management program for the storage system which should address a description of the ageing that could adversely affect structures and components important to safety. This paper provides highlights of issues related to managing effects on dry cask storage systems for long-term interim storage and transportation of used nuclear fuel.