Implementing a Project Management Information System at a Major Pipeline Corporation
Keyword(s):
A project management information system (PMIS) reports project cost and schedule information. Between 2006 and 2007 Pembina Pipeline Corporation’s Engineering Department saw the number of projects it managed leap from 89 to 147, an increase of 65%. Project managers found that their ability to report project information was being strained. This paper chronicles Pembina’s efforts in developing a PMIS to respond to the challenge.