scholarly journals Drop Testing of DOE Spent Nuclear Fuel Canisters

Author(s):  
Spencer D. Snow ◽  
D. Keith Morton ◽  
Tommy E. Rahl ◽  
Robert K. Blandford ◽  
Thomas J. Hill

The National Spent Nuclear Fuel Program (NSNFP) at the Idaho National Engineering and Environmental Laboratory (INEEL) prepared four representative Department of Energy (DOE) spent nuclear fuel (SNF) canisters for the purpose of drop testing. The first two canisters represented a modified 24-inch diameter standardized DOE SNF canister and the second two canisters represented the Hanford Multi-Canister Overpack (MCO). The modified canisters and internals were constructed and assembled at the INEEL. The MCO internal weights were fabricated at the INEEL and assembled into two MCOs at Hanford and later shipped to the INEEL for drop test preparation. Drop testing of these four canisters was completed in August 2004 at Sandia National Laboratories. The modified canisters were dropped from 30 feet onto a flat, essentially unyielding surface, with the canisters oriented at 45 degrees and 70 degrees off-vertical at impact. One representative MCO was dropped from 23 feet onto the same flat surface, oriented vertically at impact. The second representative MCO was dropped onto the flat surface from 2 feet oriented at 60 degrees off-vertical. These drop heights and orientations were chosen to meet or exceed the Yucca Mountain repository drop criteria. This paper discusses the comparison of deformations between the actual dropped canisters and those predicted by pre-drop and limited post-drop finite element evaluations performed using ABAQUS/Explicit. Post-drop containment of all four canisters, demonstrated by way of helium leak testing, is also discussed.

Author(s):  
William H. Lake ◽  
Nancy Slater-Thompson ◽  
Ned Larson ◽  
Franchone Oshinowo

Technology development activities are being conducted by the Department of Energy, Office of Civilian Radioactive Waste Management to support spent nuclear fuel and high-level radioactive waste transport to the federal repository at Yucca Mountain, Nevada in 2010. The paper discusses the motivation for pursuing transport technologies for a private sector operated transportation program, and describes some of the current technologies being pursued.


Author(s):  
Leroy Stewart ◽  
Mikal A. McKinnon

Abstract The United States Department of Energy (DOE) Office of Civilian Radioactive Waste Management conducted spent nuclear fuel integrity and cask performance tests from 1984–1996 at the Idaho National Engineering and Environmental Laboratory (INEEL). Between 1994 and 1998, DOE also initiated a Spent Fuel Behavior Project that involved enhanced surveillance, monitoring, and gas-sampling activities for intact fuel in a GNS CASTOR V/21 cask and for consolidated fuel in a Sierra Nuclear VSC-17 cask. The results of these series of tests are reported in this paper. Presently, DOE is involved in a cooperative project to perform destructive evaluations of fuel rods that have been stored in the CASTOR V/21 cask. The results of those evaluations are presented elsewhere in these proceedings in a paper entitled “Examination of Spent PWR Fuel Rods after 15 years in Dry Storage”.


Author(s):  
William H. Lake ◽  
Ned Larson ◽  
Nancy Slater-Thompson ◽  
Michael Valenzano

The Department of Energy, Office of Civilian Radioactive Waste Management expects to begin transporting spent nuclear fuel and high-level radioactive waste to the federal repository being developed at Yucca Mountain, Nevada, when it begins operations in 2010. A review of past transport acquisition activities is given. The strategy, and approach used to acquire private sector supplied equipment and services for the necessary transport activities are described and discussed.


Author(s):  
Mikal A. McKinnon ◽  
Leroy Stewart

Abstract Research studies by the Electric Power Research Institute (EPRI) established the technical and operational requirements necessary to enable the onsite cask-to-cask dry transfer of spent nuclear fuel. Use of the dry transfer system has the potential to permit shutdown reactor sites to decommission pools and provide the capability of transferring assemblies from storage casks or small transportation casks to sealed transportable canisters. Following an evaluation by the Department of Energy (DOE) and the National Academy of Sciences, a cooperative program was established between DOE and EPRI, which led to the cost-shared design of a dry transfer system (DTS). EPRI used Transnuclear, Inc., of Hawthorne, New York, to design the DTS in accordance with the technical and quality assurance requirements of the code of Federal Regulations, Title 10, Part 72 (10CFR72). EPRI delivered the final design report to DOE in 1995 and the DTS topical safety analysis report (TSAR) in 1996. DOE submitted the TSAR to the United States Nuclear Regulatory Commission (NRC) for review under 10CFR72 and requested that the NRC staff evaluate the TSAR and issue a Safety Evaluation Report (SER) that could be used and referenced by an applicant seeking a site-specific license for the construction and operation of a DTS. DOE also initiated a cold demonstration of major subsystem prototypes in 1996. After careful assessment, the NRC agreed that the DTS concept has merit. However, because the TSAR was not site-specific and was lacking some detailed information required for a complete review, the NRC decided to issue an Assessment Report (AR) rather than a SER. This was issued in November 2000. Additional information that must be included in a future site-specific Safety Analysis Report for the DTS is identified in the AR. The DTS consists of three major sections: a Preparation Area, a Lower Access Area, and a Transfer Confinement Area. The Preparation Area is a sheet metal building where casks are prepared for loading, unloading, or shipment. The Preparation Area adjoins the Lower Access Area and is separated from the Lower Access Area by a large shielded door. The Lower Access Area and Transfer Confinement Area are contained within concrete walls approximately three feet thick. These are the areas where the casks are located and where the fuel is moved during transfer operations. A floor containing two portals separates the Lower Access Area and the Transfer Confinement Area. The casks are located below the floor, and the fuel transfer operation occurs above the floor. The cold demonstration of the DTS was successfully conducted at the Idaho National Engineering and Environmental Laboratory (INEEL) as a cooperative effort between the DOE and EPRI. The cold demonstration was limited to the fuel handling equipment, the cask lid handling equipment, and the cask interface system. The demonstration included recovery operations associated with loss of power or off-normal events. The demonstration did not include cask receiving and lid handling; cask transport and lifting; vacuum/inerting/leak test; canister welding; decontamination; heating, ventilation, and air conditioning; and radiation monitoring. The demonstration test was designed to deliberately challenge the system and determine whether any specific system operation could adversely impact or jeopardize the operation or safety of any other function or system. All known interlocks were challenged. As in all new systems, there were lessons learned during the operation of the system and a few minor modifications made to ease operations. System modifications were subsequently demonstrated. The demonstration showed that the system operated as expected and provided times for normal fuel transfer operations. The demonstration also showed that recovery could be made from off-normal events.


Author(s):  
Donald Wayne Lewis

In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a “Monitored Retrievable Storage” facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to build a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE’s goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility.


Sign in / Sign up

Export Citation Format

Share Document