Attractive new technologies for 7-wavelength time domain optical mammography

2017 ◽  
Author(s):  
Edoardo Ferocino ◽  
Edoardo Martinenghi ◽  
Alberto Dalla Mora ◽  
Antonio Pifferi ◽  
Rinaldo Cubeddu ◽  
...  
2005 ◽  
Vol 50 (11) ◽  
pp. 2429-2449 ◽  
Author(s):  
Dirk Grosenick ◽  
K Thomas Moesta ◽  
Michael Möller ◽  
Jörg Mucke ◽  
Heidrun Wabnitz ◽  
...  

2021 ◽  
Author(s):  
Giulia Maffeis ◽  
Edoardo Ferocino ◽  
Alberto Dalla Mora ◽  
Rinaldo Cubeddu ◽  
Antonio Pifferi ◽  
...  

Author(s):  
H. Rinneberg ◽  
D. Grosenick ◽  
H. Wabnitz ◽  
H. Danlewski ◽  
K. Moesta ◽  
...  

2010 ◽  
Vol 8 (2) ◽  
pp. 206-209
Author(s):  
马艺闻 Yiwen Ma ◽  
高峰 Feng Gao ◽  
阮平巧 Pingqiao Ruan ◽  
杨芳 Fang Yang ◽  
赵会娟 Huijuan Zhao

2005 ◽  
Vol 12 (10) ◽  
pp. 1355
Author(s):  
Xavier Intes ◽  
Salim Djeziri ◽  
Zahia Ichalalene ◽  
Niculae Mincu ◽  
Yong Wang ◽  
...  

Author(s):  
F. Yiu ◽  
N. Liu ◽  
J. Wang ◽  
D. Litton

Successful installation of offshore piles is often challenged by the constraints of cost, technical feasibility, availability of suitable installation vessels and the environment. A practical installation procedure is defined as one that utilizes the capacity of available equipment to operate in a wide allowable environmental window. To find such procedures there is a continuing need for research, use of new technologies, and the adoption of new ideas. This paper presents a feasibility study for side launching piles from a conventional cargo barge. Sophisticated nonlinear time domain dynamic simulations formed the basis of the evaluation. Two noted software packages with nonlinear time domain dynamic finite element analysis capabilities were used to predict the trajectory of the launched pile and the resulting impulsive load on the restraining cable/wire. Analytical results from the software programs were compared to provide a first level of validation. The numerical results were in good agreement. Cable/wire properties (size, length, and material) and tug vessel velocity were varied in an effort to minimize the cable loads during the highly dynamic launch event. The study concluded that side launch was feasible and design recommendations are provided.


2005 ◽  
Vol 12 (8) ◽  
pp. 934-947 ◽  
Author(s):  
Xavier Intes

2009 ◽  
Author(s):  
Yiwen Ma ◽  
Jingyi Wang ◽  
Feng Gao ◽  
Fang Yang ◽  
Huijuan Zhao ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document