EXPRIMENTAL INVESTIGATION ON SEDIMENT CONTROL IN LATERAL INTAKES USING SILL

Author(s):  
ALI AKBAR ABBASI ◽  
MASOUD GHODSIAN ◽  
MAHDI HABIBI ◽  
ALI AKBAR SALEHI NEISHABOURI
Keyword(s):  
EDIS ◽  
2007 ◽  
Vol 2007 (17) ◽  
Author(s):  
Orlando A. Diaz ◽  
Timothy A. Lang ◽  
Samira H. Daroub ◽  
Viviana M. Nadal

SL-228-Sp, a 9-page illustrated fact sheet by O.A. Diaz, T.A. Lang, S.H. Daroub, and V.M. Nadal, is the Spanish language version of "SL228/SS448: Best Management Practices in the Everglades Agricultural Area: Controlling Particulate Phosphorus and Canal Sediments." It explains and discusses particulate P and sediment control practices, which serve as important tools in efforts to improve water quality in the basin. This EDIS article is one in a series that attempts to explain in easily understandable terms the implementation methods and rationale behind the main P load reducing BMPs employed on EAA farms. Published by the UF Department of Soil and Water Sciences, August 2007. SL228SP/SS476: Mejores Prácticas de Manejo en el Area Agrícola de los Everglades: Controlando el Fósforo en Partícula y Sedimentos en Canales (ufl.edu) Ask IFAS: Best Management Practices in the Everglades Agricultural Area series (en espanol) (ufl.edu)


2021 ◽  
Author(s):  
Renata Krasnova

Construction activities have been identified as one of the major sources of pollution to receiving waters. Although Erosion and Sediment Control (ESC) measures reduce the amount of sediment exported from construction sites, there are still significant concerns regarding the sufficiency of current control measures to protect receiving waters. This study documents the work completed to monitor and model the performance of a typical stormwater management facility used for erosion and sediment control in suburban construction site. The main objective of this study is to provide background information regarding the performance of stormwater management facilities for treating urban construction runoff prior to discharging to receiving water bodies. The RUNOFF and STORAGE TREATMENT blocks of EPA's stormwater management model (PCSWMM4.4) were used to simulate the quantity and quality of stormwater run-off from the area under construction and assess the performance of stormwater treatment facility (Ballymore Pond) located in Richmond Hill, Ontario. The performance of the construction site sediment control pond was found to be unsatisfactory due to the high outflow concentration of suspended solids. Some specific recommendations to improve its effectiveness have been made.


2021 ◽  
Author(s):  
Renata Krasnova

Construction activities have been identified as one of the major sources of pollution to receiving waters. Although Erosion and Sediment Control (ESC) measures reduce the amount of sediment exported from construction sites, there are still significant concerns regarding the sufficiency of current control measures to protect receiving waters. This study documents the work completed to monitor and model the performance of a typical stormwater management facility used for erosion and sediment control in suburban construction site. The main objective of this study is to provide background information regarding the performance of stormwater management facilities for treating urban construction runoff prior to discharging to receiving water bodies. The RUNOFF and STORAGE TREATMENT blocks of EPA's stormwater management model (PCSWMM4.4) were used to simulate the quantity and quality of stormwater run-off from the area under construction and assess the performance of stormwater treatment facility (Ballymore Pond) located in Richmond Hill, Ontario. The performance of the construction site sediment control pond was found to be unsatisfactory due to the high outflow concentration of suspended solids. Some specific recommendations to improve its effectiveness have been made.


2021 ◽  
Author(s):  
Haiyan Liu ◽  
Huaming Guo ◽  
Olivier Pourret ◽  
Maohan Liu ◽  
Zhen Wang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document