Large scale project team building

2008 ◽  
Vol 51 (10) ◽  
pp. 113-116 ◽  
Author(s):  
Mary C. Jones
Author(s):  
Lynne Siemens

Use of project teams is increasing, however little is known about collaboration as it actually occurs over the life of projects. This paper explores the nature of collaboration within Implementing New Knowledge Environments (INKE) after three years of funded research. The third year is characterized by change and transition with new team members, partners, and sub-research areas. INKE continues to draw upon structures and processes, including team building activities, in-person meetings, multiple communication channels, evolving governance documents to support the collaboration, and incorporating collaboration-ready individuals.  The paper concludes with recommendations for similar long term, large-scale project teams.


2014 ◽  
Vol 12 ◽  
pp. 3-11
Author(s):  
Zuzana Pešková

In 2006, the town council of Slany decided to respond to the new trend of regional policy in the Central Bohemia region and focused on the revitalization of the historic core of the town. The large-scale project was assigned to a team of professionals (teachers and graduates of the Faculty of Civil Engineering of the Czech Technical University in Prague), led by Professor Sykora. Team members are to deal with issues of historical centre. The project presented a challenge to test theory, principles and procedures in practical design. The projected area featured Masaryk Square and 22 adjacent streets defined by the existing town walls. The reconstruction project of Vinarickeho Street was the first part of the overall project of revitalization of the historic core of the town chosen to implement. This reconstruction was one of the most technically, organizationally and financially complex works that have been undertaken in Slany recently. Construction started in November 2010 and lasted one year. Although this is a project of smaller scope, thanks to its complexity, sensitive approach and craftsmanship it brought the creators the price Construction of the Year 2012 in the Central Bohemia region and advanced to the second round in the competition Construction of the Year 2012 in Czech Republic.


2014 ◽  
Vol 978 ◽  
pp. 27-30
Author(s):  
Si Ru Qian

After the WenChuan earthquake in may 12,2008,Many province government built the temporary houses for earthquake disaster area.For the first time, they initiate such large scale project, there are many problems emerged during the process of construction such problem like economy ,environment, engineering materials and technology. In this article, we collect problems and analysis them ,seek for the possible measures of construct the temporary house and the effective way to rebuilt the disaster area.


2018 ◽  
Author(s):  
Janosch Dlouhy ◽  
Miguel Ricalde ◽  
Bernardo Cossio ◽  
Carlos Januncio

Sign in / Sign up

Export Citation Format

Share Document