A blocking flow shop deteriorating scheduling problem via a hybrid chemical reaction optimization
2017 ◽
Vol 9
(6)
◽
pp. 168781401770137
◽
Keyword(s):
2013 ◽
Vol 145
(1)
◽
pp. 4-17
◽
2017 ◽
Vol 111
◽
pp. 239-250
◽
2015 ◽
Vol 12
(7)
◽
pp. 1300-1310
◽
2014 ◽
Vol 513-517
◽
pp. 2594-2598
2018 ◽
Vol 126
◽
pp. 1424-1433
◽