Analysis on Construction Cost Control of Saudi Aramco Project

2020 ◽  
Vol 42 (03) ◽  
pp. 177-181
Author(s):  
义 张
2020 ◽  
Vol 1687 ◽  
pp. 012012
Author(s):  
D D Koroteev ◽  
Jueru Huang ◽  
Mimi Kamrunnaher

2020 ◽  
Vol 2020 ◽  
pp. 1-12
Author(s):  
Na Lou ◽  
Jingjuan Guo

The prefabricated building as a major initiative has been put forward by China in recent years to promote the transformation and upgrading of the construction industry, but its rapid development also faces high cost constraints. Therefore, it is necessary and urgent to study the key cost drivers and cost control paths of prefabricated buildings. Most of the current research focuses on the construction cost of prefabricated building as a static object. This article, on the other hand, regards the construction cost of prefabricated building as a dynamic formation process and conducts systematic research from product systems, technical systems, construction processes, and management modes. The influence factors of prefabricated building cost are defined and screened with the help of HSM and previous research results. A cause-and-effect model and cost control model of prefabricated building cost driver are established. Based on the model test of the actual project, the cost generation of prefabricated buildings is simulated. Through sensitivity analysis, key cost drivers of prefabricated building are identified and ranked as degree of design standardization, unit price, prefabrication rate, information technology level, transportation mode, labor level, machinery level, transportation distance, etc. Accordingly, corresponding strategies are proposed for the cost control of prefabricated buildings.


2013 ◽  
Vol 438-439 ◽  
pp. 1791-1795
Author(s):  
Qiu Fang Wang ◽  
Xing Liu ◽  
Juan Fang Li

Bidding stage is one of the important stages of cost control of project construction, which is a form of beforehand control and active control. In order to make rational use of construction funds and pursuit investment returns to a greater extent, the employer should strengthen the construction cost control in the bidding phase. To begin with, this paper analyzes the significance of construction cost control in the bidding phase, states the form of expression of construction cost in the bidding phase, and focuses on the analysis of influence factors of cost control in the bidding phase. Finally it puts forward some countermeasures to prevent the risk of project cost control in the bidding phase.


2013 ◽  
Vol 711 ◽  
pp. 790-793
Author(s):  
Dong Xiao Niu ◽  
Tong Liu ◽  
Shu Yi Zhou ◽  
Ting Ting Chen

In the process of engineering project construction, cost management should be closely around three big targets: cost control, quality control and progress control. This paper analyzes the interacting relationship of these factors, then discussing the elements of engineering cost management based on the earned value method. Finally, it proposed some corresponding suggestions and measures for the developing of cost management.


Author(s):  
Chrispin Pettang ◽  
Marcelline Blanche Manjia ◽  
F. Henry Abanda

Sign in / Sign up

Export Citation Format

Share Document