scholarly journals Modelling and Simulation of Concrete Pump Truck

Author(s):  
Li Dai ◽  
Yungong Li ◽  
Jian Wang ◽  
Yu Liu
2021 ◽  
Vol 11 (18) ◽  
pp. 8482
Author(s):  
Jie Li ◽  
Yuejin Tan ◽  
Bingfeng Ge ◽  
Hua Zhao ◽  
Xin Lu

This paper proposes a method on predicting the remaining useful life (RUL) of a concrete piston of a concrete pump truck based on probability statistics and data-driven approaches. Firstly, the average useful life of the concrete piston is determined by probability distribution fitting using actual life data. Secondly, according to condition monitoring data of the concrete pump truck, a concept of life coefficient of the concrete piston is proposed to represent the influence of the loading condition on the actual useful life of individual concrete pistons, and different regression models are established to predict the RUL of the concrete pistons. Finally, according to the prediction result of the concrete piston at different life stages, a replacement warning point is established to provide support for the inventory management and replacement plan of the concrete piston.


2011 ◽  
Vol 127 ◽  
pp. 360-367 ◽  
Author(s):  
Xiao Dong Kang ◽  
Gang Huang ◽  
Xian Li Cao ◽  
Xiang Zhou

This paper takes the five –link concrete pump boom as the research object, and transforms its trajectory planning issue into a multi-object optimization problem. Using intelligent hill climbing algorithm and genetic algorithm, and integrating them closely to ensure real-time online planning for the pump truck effectively, and make the planned motion trajectory for the boom is global optimized under particular constrained conditions. Simulation and performance comparison experiments show that this hybrid algorithm is practical and effective, which offers a new approach for the trajectory planning problem of concrete pump truck.


2019 ◽  
Vol 33 (14n15) ◽  
pp. 1940033 ◽  
Author(s):  
Sang-Jin Lee ◽  
Il-Sup Chung ◽  
Sung-Youl Bae

This research presents structural design and analysis results of applying a composite boom structure on a Concrete Pump Truck (CPT). Carbon Fiber Reinforced Plastic (CFRP) is used to complete the structural design of the end boom to reduce the weight of the CPT. The weight of the newly designed end boom is reduced by 32% compared to the original steel component. Structural analysis is accomplished by applying static load combinations of self-weight of the boom and the weights of the pipes, the concrete and the drain hose. The results show that the tip deflection is reduced by 30% compared to the conventional end boom. Also, equivalent stress is considerably lower than the conventional design. Composite failure evaluation of the CFRP end boom is conducted by post-processing the stress results using Puck’s failure criteria. The evaluation results show that the design criteria are met on the static load of the pump truck. Specifically, it is expected that fiber failure and inter fiber failure of the boom do not occur under loading conditions according to the design evaluation results.


Author(s):  
Hong-Feng Ma ◽  
Yong-Neng Lu ◽  
Xiao-Qiang Guo

2015 ◽  
Vol 19 (sup5) ◽  
pp. S5-787-S5-793
Author(s):  
Y. Hu ◽  
S. Xu ◽  
J. Zhang ◽  
G. Ding ◽  
Z. Zhou ◽  
...  

2014 ◽  
Vol 635-637 ◽  
pp. 1256-1259
Author(s):  
Qin Xing ◽  
Li Yin Zhang ◽  
Yong Wei Sun ◽  
Tao Sun ◽  
Xue Hua Yu

A method is presented for determining the pouring point location of concrete pump truck. The method does not change the structure of the concrete pump truck, only need to replace the hydraulic cylinders of booms with the hydraulic cylinders with displacement senor, and the displacement sensors are mounted in the inside of the hydraulic cylinders and do not need any extra protection. The relationship formulas between the contraction and expansion amounts of the hydraulic cylinders and the pouring point location are derived and programmed to input into a data processing unit. The contraction and expansion amounts of the hydraulic cylinders are timely acquired and inputted into the data processing unit, then the pouring point location can be displayed in real-time on the screen of radio controller, and the workers can quickly and accurately locate the pouring point of the concrete pump truck to poured point.


2009 ◽  
Vol 16-19 ◽  
pp. 806-810 ◽  
Author(s):  
Li Dai ◽  
Jian Wang ◽  
Bo Zhao ◽  
Jie Liu

For the concrete pump truck, the movements of the arm and the hydraulic cylinder are analyzed respectively with multi-body dynamic theory. And with the applying of PD control theory, the dynamic equation of arm system is also built. And according to the numerical solution of the equation, it is proved that the dynamic equation can describe every dynamic character of the concrete pump truck well.


Sign in / Sign up

Export Citation Format

Share Document