scholarly journals Modelling of integrated scheduling problem of capacitated equipment systems with a multi-lane road network

PLoS ONE ◽  
2021 ◽  
Vol 16 (6) ◽  
pp. e0251875
Author(s):  
Di Luan ◽  
Mingjing Zhao ◽  
Qianru Zhao ◽  
Nan Wang

The coordination of different container-handling equipment is an important method for improving the overall efficiency of automated container terminals. In the real terminal, we should consider many real-life issues, such as the equipment capacity, the equipment collision, changing lanes in the multi-lane road, and choosing one of container-handling lanes for each container. This paper proposes the integrated scheduling problem of three container-handling equipment with the capacity constraint and the dual-cycle strategy, for simultaneously solving the equipment scheduling problem, the assignment problem of the container-handling lane and the conflict-free route planning problem of automated guided vehicles (AGVs). With the objective of minimizing the ship’s berth time, we propose a mixed-integer programming model based on the space-time network representation method and two bilevel optimization algorithms based on conflict resolution rules. Finally, numerical experiments are conducted to verify the effectiveness of the proposed model and two bilevel optimization algorithms.

2019 ◽  
Vol 2019 ◽  
pp. 1-14 ◽  
Author(s):  
Meisu Zhong ◽  
Yongsheng Yang ◽  
Yamin Zhou ◽  
Octavian Postolache

With the development of automated container terminals (ACTs), reducing the loading and unloading time of operation and improving the working efficiency and service level have become the key point. Taking into account the actual operation mode of loading and unloading in ACTs, a mixed integer programming model is adopted in this study to minimize the loading and unloading time of ships, which can optimize the integrated scheduling of the gantry cranes (QCs), automated guided vehicles (AGVs), and automated rail-mounted gantries (ARMGs) in automated terminals. Various basic metaheuristic and improved hybrid algorithms were developed to optimize the model, proving the effectiveness of the model to obtain an optimized scheduling scheme by numerical experiments and comparing the different performances of algorithms. The results show that the hybrid GA-PSO algorithm with adaptive autotuning approaches by fuzzy control is superior to other algorithms in terms of solution time and quality, which can effectively solve the problem of integrated scheduling of automated container terminals to improve efficiency.


Author(s):  
Felix Hübner ◽  
Patrick Gerhards ◽  
Christian Stürck ◽  
Rebekka Volk

AbstractScheduling of megaprojects is very challenging because of typical characteristics, such as expected long project durations, many activities with multiple modes, scarce resources, and investment decisions. Furthermore, each megaproject has additional specific characteristics to be considered. Since the number of nuclear dismantling projects is expected to increase considerably worldwide in the coming decades, we use this type of megaproject as an application case in this paper. Therefore, we consider the specific characteristics of constrained renewable and non-renewable resources, multiple modes, precedence relations with and without no-wait condition, and a cost minimisation objective. To reliably plan at minimum costs considering all relevant characteristics, scheduling methods can be applied. But the extensive literature review conducted did not reveal a scheduling method considering the special characteristics of nuclear dismantling projects. Consequently, we introduce a novel scheduling problem referred to as the nuclear dismantling project scheduling problem. Furthermore, we developed and implemented an effective metaheuristic to obtain feasible schedules for projects with about 300 activities. We tested our approach with real-life data of three different nuclear dismantling projects in Germany. On average, it took less than a second to find an initial feasible solution for our samples. This solution could be further improved using metaheuristic procedures and exact optimisation techniques such as mixed-integer programming and constraint programming. The computational study shows that utilising exact optimisation techniques is beneficial compared to standard metaheuristics. The main result is the development of an initial solution finding procedure and an adaptive large neighbourhood search with iterative destroy and recreate operations that is competitive with state-of-the-art methods of related problems. The described problem and findings can be transferred to other megaprojects.


2013 ◽  
Vol 380-384 ◽  
pp. 4775-4781
Author(s):  
Ji Feng Qian ◽  
Xiao Ning Zhu ◽  
Zhan Dong Liu

In order to improve the efficiency of the handling operations equipment in container terminal, reduce the waiting time of container ship in Port, this paper researches the integrated scheduling of the different types of handling equipment in container terminal, considers the constraints of different handling equipment impact between each other, build a mixed integer programming model, presents a heuristic algorithm for the of the scheduling problem and gets the approximate solution. The results show that the integrated scheduling can effectively reduce the time of the ship staying in port, and improve the overall operating efficiency of the port.


2012 ◽  
Vol 2012 ◽  
pp. 1-18 ◽  
Author(s):  
Rafael N. Rodrigues ◽  
Edson L. da Silva ◽  
Erlon C. Finardi ◽  
Fabricio Y. K. Takigawa

This paper addresses the short-term scheduling problem of hydrothermal power systems, which results in a large-scale mixed-integer nonlinear programming problem. The objective consists in minimizing the operation cost over a two-day horizon with a one-hour time resolution. To solve this difficult problem, a Lagrangian Relaxation (LR) based on variable splitting is designed where the resulting dual problem is solved by a Bundle method. Given that the LR usually fails to find a feasible solution, we use an inexact Augmented Lagrangian method to improve the quality of the solution supplied by the LR. We assess our approach by using a real-life hydrothermal configuration extracted from the Brazilian power system, proving the conceptual and practical feasibility of the proposed algorithm. In summary, the main contributions of this paper are (i) a detailed and compatible modelling for this problem is presented; (ii) in order to solve efficiently the entire problem, a suitable decomposition strategy is presented. As a result of these contributions, the proposed model is able to find practical solutions with moderate computational burden, which is absolutely necessary in the modern power industry.


2013 ◽  
Vol 446-447 ◽  
pp. 1334-1339 ◽  
Author(s):  
Seyed Hamidreza Sadeghian ◽  
Mohd Khairol Anuar Bin Mohd Ariffin ◽  
Say Hong Tang ◽  
Napsiah Binti Ismail

Automation of the processes at the quays of the world's large container ports is one of the answers to the required ever-increasing transshipment volumes within the same timeframe. For such purpose, using new generation of vehicles is unavoidable. One of the automatic vehicles that can be used in container terminals is Automated Lifting Vehicle (ALV). Integrated scheduling of handling equipments with quay cranes can increase the efficiency of automated transport systems in container. In this paper, an integrated scheduling of quay cranes and automated lifting vehicles with limited buffer space is formulated as a mixed integer linear programming model. This model minimizes the makespan of all the loading and unloading tasks for a pre-defined set of cranes in a scheduling problem.


Author(s):  
Arpan Rijal ◽  
Marco Bijvank ◽  
Asvin Goel ◽  
René de Koster

Scheduling the availability of order pickers is crucial for effective operations in a distribution facility with manual order pickers. When order-picking activities can only be performed in specific time windows, it is essential to jointly solve the order picker shift scheduling problem and the order picker planning problem of assigning and sequencing individual orders to order pickers. This requires decisions regarding the number of order pickers to schedule, shift start and end times, break times, as well as the assignment and timing of order-picking activities. We call this the order picker scheduling problem and present two formulations. A branch-and-price algorithm and a metaheuristic are developed to solve the problem. Numerical experiments illustrate that the metaheuristic finds near-optimal solutions at 80% shorter computation times. A case study at the largest supermarket chain in The Netherlands shows the applicability of the solution approach in a real-life business application. In particular, different shift structures are analyzed, and it is concluded that the retailer can increase the minimum compensated duration for employed workers from six hours to seven or eight hours while reducing the average labor cost with up to 5% savings when a 15-minute flexibility is implemented in the scheduling of break times.


2020 ◽  
Vol 7 (6) ◽  
pp. 761-774
Author(s):  
Kailash Changdeorao Bhosale ◽  
Padmakar Jagannath Pawar

Abstract Production planning and scheduling problems are highly interdependent as scheduling provides optimum allocation of resources and planning is an optimum utilization of these allocated resources to serve multiple customers. Researchers have solved production planning and scheduling problems by the sequential method. But, in this case, the solution obtained by the production planning problem may not be feasible for scheduling method. Hence, production planning and scheduling problems must be solved simultaneously. Therefore, in this work, a mathematical model is developed to integrate production planning and scheduling problems. The solution to this integrated planning and scheduling problem is attempted by using a discrete artificial bee colony (DABC) algorithm. To speed up the DABC algorithm, a k-means clustering algorithm is used in the initial population generation phase. This k-means clustering algorithm will help to converge the algorithm in lesser time. A real-life case study of a soap manufacturing industry is presented to demonstrate the effectiveness of the proposed approach. An objective function to minimize overall cost, which comprises the processing cost, material cost, utility cost, and changeover cost, is considered. The results obtained by using DABC algorithm are compared with those obtained by CPLEX software. There is a saving of ₹2 23 324 for weeks 1–4 in overall cost compared with the results obtained by using CPLEX software.


Sign in / Sign up

Export Citation Format

Share Document