scholarly journals Identification of the priority regions in the customer water meters replacement using the AHP and ELECTRE methods

Author(s):  
Mahmut FIRAT
Keyword(s):  
2014 ◽  
Vol 9 (2) ◽  
pp. 150-157
Author(s):  
Koral Wojciech

This paper describes the sectorisation of a water network, as operated by the water and sewage utility (PWiK Gliwice, Poland) with electromagnetic water-meters (battery powered). This solution allows supply of District Metered Areas (DMA) by a few points without ‘dead-end’ pipework and shows that the main problems of the Utility are small, hidden leaks. Additionally the paper describes a water balance for the town of Pyskowice (part of the Gliwice water network) where all water meters are read by radio (automatic meter reading – AMR).


Author(s):  
Daniel Schumann ◽  
Corinna Kroner ◽  
Bülent Unsal ◽  
Søren Haack ◽  
Johan Bunde Kondrup ◽  
...  

2021 ◽  
Vol 293 ◽  
pp. 112846
Author(s):  
Ian Monks ◽  
Rodney A. Stewart ◽  
Oz Sahin ◽  
Robert J. Keller
Keyword(s):  

2021 ◽  
Author(s):  
Rachel Cardell-Oliver ◽  
Harrison Carter-Turner

Author(s):  
Carmen Virginia Palau ◽  
Juan Manzano ◽  
Iban Balbastre Peralta ◽  
Benito Moreira de Azevedo ◽  
Guilherme Vieira do Bomfim

To maintain quality measurement of water consumption, it is necessary to know the metrology of single-jet water meters over time. Knowing the accuracy of these instruments over time allows establishing a metrological operation period for different flow rates. This will aid water companies to optimize management and reduce economic losses due to unaccounted water consumption. This study analyzed the influence of time on the measurement error of single-jet water meters to evaluate the deterioration of the equipment and, with that, launch the metrological operation period. According to standards 8316 and 4064 of the International Organization for Standardization (ISO), 808 meters of metrological Class B were evaluated in six water supplies, with age ranges of 3.7 to 16.4 years of use. The measurement error was estimated by comparing the volume measured in a calibrated tank with the volume registered by the meters at flow rates of 30, 120, 750 and 1,500 L h-1. The metrological operation period of the meters was obtained for each flow rate by the relation between error of measurement and time of use (simple linear regression). According to the results, the majority of the equipment presents increasing under-registration errors over time, more pronounced at low flow rates and with less favorable operating conditions. The metrological operation period for flow rates of 30, 120, 750 and 1,500 L h-1 is estimated at approximately 3, 8, 14 and 13 years. This operation period combined with consumption patterns of users will establish the best time to replace the meters.


Sign in / Sign up

Export Citation Format

Share Document