Designer-Led Design/Build — Alternative Project Delivery Method for Façade Evaluation and Repair Projects — Case Study on an 11 Story Apartment Building

Author(s):  
DA VanOcker
2014 ◽  
Vol 2014 ◽  
pp. 1-8 ◽  
Author(s):  
Xiang Ding ◽  
Zhaohan Sheng ◽  
Jianguo Du ◽  
Qian Li

Project delivery planning is a key stage used by the project owner (or project investor) for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.


2016 ◽  
Vol 13 (2) ◽  
pp. 81 ◽  
Author(s):  
Sabihah Saaidin ◽  
Intan Rohani Endut ◽  
Abu Samah Abu Samah ◽  
Ahmad Ruslan Mohd Ridzuan

This paper discusses the design-build project delivery method which is becoming an increasingly viable alternative to traditional project delivery method in the public sector. This interest has led to dialogue among public sector agencies to establish and formalise understanding of the design-build process and its implementation. The process consists of six stages namely Project Definition, Request for Qualification, Request for Proposal, Proposal Submission and Evaluation, Contract Award, and Document/Construction. Therefore, this finding of Design-Build (DB) procurement process is on the improvement and understanding on an owner and contractor in practice and implementation in Malaysia.  Keywords: design/build, design/bid/build, advantage and disadvantage, procurement process


2013 ◽  
Vol 357-360 ◽  
pp. 2171-2176
Author(s):  
Ming Teh Wang ◽  
Chi Chen Tsai ◽  
Luh Maan Chang ◽  
Thanh Long Ngo ◽  
Van Duc Mai ◽  
...  

Even though the design-build (DB) delivery method has become a popular construction project delivery method in many countries, it is relatively rare in Taiwan. This study investigates the problems and difficulties that Taiwanese owners may encounter during using DB delivery methods. Twenty six problems over the four key stages of the DB process were first identified based on previous studies and expert interviews. A questionnaire survey was then conducted to determine the most pressing problems for Taiwan. The results of statistical analyses show that Taiwanese owners face key problems at all stages of the DB delivery method, especially during the tender preparation and valuation stages. These findings can be used by Taiwanese owners for successfully executing DB projects.