A NEW MODEL FOR PREDICTING THE ADVANCE RATE OF A TUNNEL BORING MACHINE (TBM) IN HARD ROCK CONDITIONS
2013 ◽
Vol 73
(1)
◽
pp. 23-35
◽
Keyword(s):
2018 ◽
Vol 10
(1)
◽
pp. 168781401875472
◽
2018 ◽
Vol 78
(5)
◽
pp. 3799-3813
◽
Keyword(s):
2013 ◽
Vol 4
(3)
◽
pp. 249
◽
Keyword(s):
2015 ◽
Keyword(s):
Keyword(s):
Keyword(s):
1993 ◽
Vol 30
(4)
◽
pp. A263
2011 ◽
Vol 199-200
◽
pp. 1331-1334
◽
Keyword(s):
2015 ◽
Vol 51
(9)
◽
pp. 199
◽