Collaborative Prototype Development & Test Project for a Novel Hybrid Solar Concentrating Cogeneration System

Author(s):  
Mithra Sankrithi ◽  
Shani Watkins
2010 ◽  
Vol 130 (5) ◽  
pp. 646-654 ◽  
Author(s):  
Miao Hong ◽  
Satoshi Horie ◽  
Yushi Miura ◽  
Tosifumi Ise ◽  
Yuki Sato ◽  
...  

2019 ◽  
Author(s):  
Dorien Huijser
Keyword(s):  

Brief summary of preprint


2016 ◽  
Vol 7 (2) ◽  
pp. 131-138
Author(s):  
Ivransa Zuhdi Pane

Data post-processing plays important roles in a wind tunnel test, especially in supporting the validation of the test results and further data analysis related to the design activities of the test objects. One effective solution to carry out the data post-processing in an automated productive manner, and thus eliminate the cumbersome conventional manual way, is building a software which is able to execute calculations and have abilities in presenting and analyzing the data in accordance with the post-processing requirement. Through several prototype development cycles, this work attempts to engineer and realize such software to enhance the overall wind tunnel test activities. Index Terms—software engineering, wind tunnel test, data post-processing, prototype, pseudocode


1988 ◽  
Author(s):  
David A. Schafer ◽  
Paul R. Trybus ◽  
Steven P. Cave

2004 ◽  
Author(s):  
Christopher R. Graves ◽  
Charles G. Heiden ◽  
Samuel N. Jenkins ◽  
Michael R. Flynn ◽  
Paul G. Smith

2020 ◽  
Author(s):  
Shivendra Nandan ◽  
Rishikesh Trivedi ◽  
Satyajeet Kant ◽  
Javed Ahmad ◽  
M. Maniraj

Sign in / Sign up

Export Citation Format

Share Document