scholarly journals SISTEM PENDUKUNG KEPUTUSAN TENDER PROYEK INFRASTRUKTUR JARINGAN KOMPUTER UPTD SMA 3 TEGAL DENGAN METODE BENEFIT COST RATIO (BCR)

2017 ◽  
Vol 1 (2) ◽  
pp. 77
Author(s):  
Haries Anom Susetyo Aji Nugroho ◽  
Khoirul Mustofa

<p><em>Procurement process of computer network infrastructure is one of the critical aspects for bussiness process UPTD SMA 3 Tegal. Way of the procuremen process is by project tender. Aim of project tender is budget efficiency UPTD SMA 3 Tegal. One of company will submit a proposal with the excess of the price and profit of them. For make it easier then a tool is needed, it is Decision Support System (DSS) by method a Benefit Cost Ratio (BCR). File of tender entered on this system is file of company,company address, owner name, type of tender, bid price and many more documents have been verified by admin of this decision support system. Output from this decision support system is acompany’s name of the winner of the tender of computer network infrastructure base on benefit cost ratio (BCR) method that has been applied to desicion support system.  </em></p>

2017 ◽  
Vol 5 (2) ◽  
pp. 855
Author(s):  
Siti Hardiyanti Rukmana

The procurement process became one of the important aspects for PT. PLN (Persero) to operate the company. One way to meet these needs is through the project tender. The tender process aims to get high-grade materials with the lowest prices that meet the criteria of efficiency PT. PLN (Persero). In order to simplify the bidding process required a decision support system. The method used in this system is Benefit Cost Ratio (BCR). Input in this application are the documents and the tender offer price from bidders with complete tender documents that have been validated by prospective bidders and then selected by the tender committee to make an assessment and validation winner. The output of this process is the winner of the tender project based on calculations Benefit Cost Ratio (BCR). Therefore, the method Benefit Cost Ratio (BCR) can be used as a decision support system to determine the winner of the project tender.


2016 ◽  
Vol 14 (1) ◽  
pp. 156
Author(s):  
Difana Meilani ◽  
Ryan Amirulfiras

The implementation of decision support system will be applied to support the regional investment of West Sumatera by providing a feasibility study analysis; exclusively the aspects of economic and financial criteria. This research was carried out in West Sumatera Regional Investment Coordinating Board as the authorities of regional investment licensing and controlling. The first step in designing a decision support system is conducting Pre – Study. It consists of literature study and pre–design study related to field of study. Next step is using Unified Modeling Language (UML) method to provide, represent and visualize the system. The basic model of financial feasibility study is implemented by using the predetermined assumption as the scope of the best system performance. The system design which is implemented uses the Web and GIS concept. Otherwise, the expected result from the research is the application is able to calculate the basic data from financial feasibility aspect into needed information in order to analyze the feasibility of any investments. The result should be converted into Net Present Value, Benefit Cost Ratio, Internal Rate of Returns, and Payback Period value. The last step of the research is verification and validation in order to make sure the ability of application accommodating the pre -design system requirements. The result of verification and validation is able to accommodate the pre -designsystem requirements conclusively.Keywords: Feasibility, Financial, Investment, Decision Support System, GISAbstrakPerancangan Sistem Penujang Keputusan (SPK) ini dilakukan dalam upaya mendukung promosi investasi daerah dengan menyediakan sebuah aplikasi yang dapat membantu memberikan penilaian terhadap kelayakan sebuah investasi yang dilihat dari sisi ekonomi finansialnya. Penelitian ini di lakukan di BKPMP (Badan Kordinasi Penanaman Modal Provinsi Sumatera Barat) sebagai pihak berwenang dalam menentukan perizinan dan pengawasan investasi provinsi. Tahapan awal adalah dengan melakukan studi pendahuluan terhadap kajian bidang terkait. Tahap selanjutnya dengan menggunakan metode UML (Unified Modelling Language) yang memberikan gambaran visual dari sistem yang dirancang. Implementasi nyata dari sistem dengan menetapkan model dasar (modelbase) kelayakan finansial standar dengan beberapa asumsi sebagai ruang lingkup perancangan aplikasi. Perancangan aplikasi dilakukan dengan mengintegrasikan konsep Web dan GIS. Kemampuan aplikasi dalam menyediakan hasil pengolahan data-data dasar yang dibutuhkan pada sebuah kelayakan finansial dan mengkonversinya kedalam kriteria kelayakan investasi seperti Net Present Value, Benefit Cost Ratio, Internal Rate of Returns, dan Payback Period. Setelah dilakukan tahap perancangan aplikasi, maka dilakukan verifikasi dan validasi terhadap aplikasi yang dirancang. Hal ini ditujukan agar dapat dilihat apakah aplikasi telah mampu mengakomodasi setiap fungsi yang ada pada rancangan awal. Dari hasil verifikasi dan validasi telah dapat disimpulkan bahwa aplikasi ini dapat berjalan sesuai dengan harapan.Kata kunci: Kelayakan, Finansial, Investasi, Sistem Penunjang Keputusan, GIS


Author(s):  
Siti Hardiyanti Rukmana ◽  
Much Aziz Muslim

The procurement process became one of the important aspects for PT. PLN (Persero) to operate the company. One way to meet these needs is through the project tender. The tender process aims to get high-grade materials with the lowest prices that meet the criteria of efficiency PT. PLN (Persero). In order to simplify the bidding process required a decision support system. The method used in this system is Benefit Cost Ratio (BCR). Input in this application are the documents and the tender offer price from bidders with complete tender documents that have been validated by prospective bidders and then selected by the tender committee to make an assessment and validation winner. The output of this process is the winner of the tender project based on calculations Benefit Cost Ratio (BCR). Therefore, the method Benefit Cost Ratio (BCR) can be used as a decision support system to determine the winner of the project tender.


Author(s):  
Siti Hardiyanti Rukmana ◽  
Much Aziz Muslim

The procurement process became one of the important aspects for PT. PLN (Persero) to operate thecompany. One way to meet these needs is through the project tender. The tender process aims to get high-gradematerials with the lowest prices that meet the criteria of efficiency PT. PLN (Persero). In order to simplify thebidding process required a decision support system. The method used in this system is Benefit Cost Ratio (BCR).Input in this application are the documents and the tender offer price from bidders with complete tender documentsthat have been validated by prospective bidders and then selected by the tender committee to make an assessment andvalidation winner. The output of this process is the winner of the tender project based on calculations Benefit CostRatio (BCR). Therefore, the method Benefit Cost Ratio (BCR) can be used as a decision support system to determinethe winner of the project tender.


2021 ◽  
Vol 108 (june) ◽  
pp. 1-5
Author(s):  
Bhanuprakash c ◽  
◽  
Sankari A ◽  
Ushanandhini Devi H ◽  
Murali Arthanari Arthanari ◽  
...  

The present study aimed to identify suitable training system for bitter gourd cultivation,The experiment was conducted at College Orchard, Horticultural College and Research Institute, Tamil Nadu Agricultural University, Coimbatore. Among the different training systems evaluated, pandal system recorded the highest vine length (481.81 cm), followed by the bamboo training system (476.76cm). The treatment using fish net training system showed the highest internodal length (6.34 cm). Pandal training system exhibited the highest number of branches (10.04). Earliness in terms of days for the appearance of male and female flowers was observed in pandal training system (41.33 and 53.16 days respectively). Days to 50% flowering was also found earlier in the pandal system (64.23 days). The narrow sex ratio (5.86) was observed in the bamboo pole support system tied with gunny thread. The pandal system recorded the highest number of fruits per vine (78.66) and gunny thread training system recorded the lowest number of fruits (34.83). The highest fruit length of 21.35 Madras Agric.J., 2021; doi: 10.29321/MAJ.10.000291(online first) cm and fruit diameter of 3.57 cm wererecorded inthe pandal training system. The maximum fruit weight was recorded in the pandal system (74.12 g fruit-1) and the minimum fruit weight was observed (52.74g fruit-1) in the fish net system. Pandal training system exhibited the highest yield plant-1 (5.79 kg plant-1), yield plot-1 (132.65 kg) and yield hectare-1 (119.16 q ha-1) while the lowest values were recorded under gunny thread system of cultivation. Among the different training systems pandal/conventional training system is more economical with a benefit-cost ratio of 2.51 followed by bamboo system, fish net system and bamboo poles support system tied with gunny thread


Author(s):  
Diean Oktavian Regar ◽  
Aqli Mursadin

PT Adaro Indonesia is trying to adjust a vertical clearance under Tabalong Bridge 1 (unloaded) and Tabalong Bridge 2 (loaded) because the existing conditions still apply a minimum vertical clearance of 4 m. I t should be in accordance with latest Regulation of the Minister of Public Works No. 19/PRT/M/2011 that for vertical clearance above national road at least 5.1 m. This specification has not been met by the national road under the Tabalong 1 & 2 Bridges bec ause both bridges were built in the 90s. Therefore we need an engineering technique to overcome this. There are 2 alternative designs, namely lowering the elevation of the national road and increasing the elevation of the bridge's upper structure to mitiga te oversized vehicles so as not to hit the lower structure of the Tabalong bridge. In determining the selection of the best alternative designs in this research is based on two (2) things, non financial criteria with Analytical Hierarchy Process (AHP) and financial criteria with Life Cycle Cost Analysis (LCCA)/Benefit Cost Ratio (BCR) method. This study uses a survey method by distributing questionnaires and interviews as a means of collecting primary data. In addition, previous research and consultant DED documents were used as a means of collecting secondary data. The AHP method is used to process primary data to produce a decision from a non financial aspect. While the LCC/BCR method is used to process secondary data to produce a decision from the financi al aspect . The results of the AHP analysis obtained that the synthesis value of the decision the option of lowering national roads was 85% and the bridge lifting option was 15% and the consistency ratio (CR) was 0.05 < 0.1. The consistency ratio below 0.1 shows that the questionnaire data from the respondents are consistent. The results of the analysis of Life Cycle Cost (LCC) obtained the option of lowering national roads where the LCC value is Rp. 44,877,651,669.27 more economical than the bridge lifting option. Then the results of the Benefit Cost Ratio (BCR) analysis obtained the option of lowering national roads with a BCR value of 2.33 > 1 and NPV = Rp. 43,442,264,804.34 > 1 means that the option lowering national roads is feasible. While the bridge li fting option is obtained by analyzing the value of BCR = 0.98 < 1 and NPV = option is not feasible to implement.


2011 ◽  
Vol 268-270 ◽  
pp. 1447-1450
Author(s):  
Hong Fei Wang

For the Group Decision Support System (GDSS), the problems of the communication barriers are presented in this paper, and the elimination of the influence of individual adaptive attitude is analyzed and studied on group decision. Moreover, a mode of communication with the purpose of reaching an effective consensus is proposed. Additionally, the technical support and network infrastructure to solve the problem are provided in the systematic design of GDSS.


Author(s):  
Zhirui Ye ◽  
Christopher K. Strong ◽  
Xianming Shi ◽  
Steven M. Conger ◽  
David L. Huft

2020 ◽  
Vol 1 (1) ◽  
pp. 28
Author(s):  
Meriana Wahyu Nugroho ◽  
Lyya Supriono

The level of society’s awareness on education is very high. The society’s enthusiasm to take a higher education is enormous. Every year the society’s interest in joining Hasyim Asy'ari University of Tebuireng Jombang is increasing. For this reason, Hasyim Asy'ari University of Tebuireng Jombang plans to add the classes by constructing new buildings that can accommodate more students each year. Every construction certainly has a risk. To anticipate this, a feasibility study is carried out at the early stages of construction planning so that later the construction runs well. There are three methods used to analyze investment feasibility, namely, Net Present Value (NPV) method, Benefit Cost Ratio (BCR) method and Internal Rate of Return (IRR) method. Besides using those methods, the payback period for the building construction project of Hasyim Asy'ari University of Tebuireng Jombang is also calculated. Based on the results of the analysis conducted, it was found that the construction of Hasyim Asy'ari University of Tebuireng Jombang was feasible to be carried out referring to the NPV and B/C values which were higher than one and the IRR value was higher than MARR and the payback period was for 7 years and 5 months. Thus, the investment project is declared feasible to proceed.


Sign in / Sign up

Export Citation Format

Share Document