Risk Analysis Model of Offshore Engineering Project Management Based on Fuzzy Membership Function

2019 ◽  
Vol 98 (sp1) ◽  
pp. 92
Author(s):  
Wenxian Li
2011 ◽  
Vol 94-96 ◽  
pp. 2238-2242
Author(s):  
Yan Qun Tang ◽  
Wei Zeng

Basing on the analysis of problems existing in the comprehensive decision-making and balanced optimizing of project programs, the writer has introduced the method of physical planning to solve the problems of comprehensive decision-making and optimizing in the quality of the project management – time limit for a project - cost, and established the quality - time limit for a project- cost comprehensive evaluation and decision model as well as the quality - time limit for a project - cost optimization model. The proposed method has been proved effective through the cases of highway engineering project management.


Sign in / Sign up

Export Citation Format

Share Document