First Worldwide Successful Implementation of Coiled Tubing Compatible Novel Fiber Laden Diverter for Matrix Stimulation Using New Generation High Rate Fiber Optic Real Time Telemetry System

2016 ◽  
Author(s):  
Ataur R. Malik ◽  
Ali H. Yaseen ◽  
Tolulope M Ogundare ◽  
Mohammed A. Asiri ◽  
Abdulmohsin A. Younis ◽  
...  
2017 ◽  
Author(s):  
Ahmed. Duaij ◽  
Danish. Ahmed ◽  
Mohammad Arifin ◽  
Adzlan Ayob ◽  
Rodrigo Sa ◽  
...  

2016 ◽  
Author(s):  
Diego Blanco ◽  
Khalid Rahimov ◽  
Silviu Livescu ◽  
Louis Garner ◽  
Lubos Vacik

2020 ◽  
Author(s):  
Marco Lerose ◽  
Luca Pelusi ◽  
Salvatore Spagnolo ◽  
Marco Scarso ◽  
Marco Colombo ◽  
...  

2011 ◽  
Author(s):  
Rodrigo Aviles ◽  
Jose G. Flores ◽  
Frederic Martin ◽  
Alan Diaz ◽  
Luis Eugenio Davila De Garate ◽  
...  

2015 ◽  
Author(s):  
R. Saldeev ◽  
A. A. Al-Mulhim ◽  
M. A. Atwi ◽  
H. Al-Obaid ◽  
G. Brown ◽  
...  

2021 ◽  
Author(s):  
Khaled M. Matar ◽  
Abdullah B. Al-Mutairi ◽  
Nakul Khandelwal ◽  
Sapna Chawla ◽  
Mohammad Alkreebani ◽  
...  

Abstract Drilling a multilateral well is generally recommended for several reasons such as achieving higher productivity indices and improving recovery in tight, low-permeable zones. While the many benefits of multilateral wells are attractive, they also have drawbacks which make these wells challenging. A key challenge is how to effectively stimulate all the laterals after they have been drilled. This paper presents the application of a unique intervention technique in a multilateral well to stimulate several laterals in a single run. To increase reservoir contact area the operator drilled a multilateral well composed of 4 legs. This was carried out despite the absence of proven ways to stimulate each lateral individually. This intervention would also present the following challenges: Well displacement and stimulation would require multiple re-entries into each lateral, all conducted from a drilling rig. All the laterals were known to branch off from the low side of the bore, so individual lateral and main-bore selection would be complex. Extended reach laterals require accurate friction lockup modelling and mitigations. The unique solution presented in this paper includes the use of real-time Hybrid cable coiled tubing (RTHCT) technology. This incorporates a hybrid cable installed in the coiled tubing (CT) string and a modular sensing bottom-hole assembly (MSBHA). Electrically controlled indexing tool, inclination sensor, tool-face sensor, and hydraulic knuckle joint were used as part of the BHA to enable real-time diagnostics and dynamic controls from surface to successfully enter the lateral legs. The MSBHA enabled the orientation of the BHA electrically to any position required using software to determine and control the exact position of the BHA. This paper presents a solution to all the above-mentioned challenges. It discusses the successful implementation of the RTHCT to displace and stimulate all the 4 laterals in a single CT trip in less than seven days, pumping over 7,000 bbls of various chemical systems and covering an open-hole length of 11,176 ft. Unlike other technologies, the RTHCT technology confirmed entries into the laterals without the need to tag the bottom of the lateral, saving substantial time. Enabling re-entry in these 4 laterals represented a world record translating into major efficiency improvements and cost savings for the project. This intervention also represented the first time in Kuwait that more than 2 laterals have been accessed in a CT run.


Sign in / Sign up

Export Citation Format

Share Document