Lessons Learned from Effective Well Integrity Management in Offshore Field

2019 ◽  
Author(s):  
Abdullah M. Al-Dhafeeri ◽  
Shebl Fouad Abo Zkery ◽  
Saad Ahmed Al Sdeiri
2021 ◽  
Author(s):  
Fianti Ramadhani ◽  
Syaiful Nurdin ◽  
Michael Olu Etuhoko ◽  
Yang Zhi ◽  
Sugeng Mulyono ◽  
...  

Abstract Four high-pressure-high temperature (HPHT) and sour gas wells are currently operating at Madura offshore as the only productive assets for Husky-CNOOC Madura Limited (HCML). Each well performance is very crucial to fulfill the demand of the gas customers in East Java, Indonesia. Since starting production in 2017, the wells experienced two main well integrity challenges, high annulus pressure and wellhead growth. Both challenges are very dependent to the well flow rate and the flow duration. A continuous operation monitoring is highly required in order to keep the wells operating safely. To overcome the challenges, HCML established a Well Integrity Management System (WIMS) document that approached several international standards as its basis. As company grows, development plan challenged the WIMS to perform faster and more efficient as compared to the existing manual system. From there, the journey of WIMS digitalization began. The journey started with the alignment of the existing WIMS document to the ISO-16530-1 at Operational Phase with more stringent boundary to operate the wells safely. The alignment covers, but not limited to the organizational structure, well barriers and criteria, monitoring and surveillance, annulus pressure management, and maintenance. The document also covered risk assessment and management of well integrity failure, which was the backbone of the WIMS digitalization. The current digital solutions allow production data to be accessed and retrieved directly from the system for analysis purposes. It compares the recorded data with pre-determined rules and parameters set in the system. It triggers a notification to the responsible personnel to perform the required action should any anomaly occurs. It also can send a reminder to users to schedule and complete a well Integrity test to ensure that a well is always in compliance with the WIMS. All test reports and documentation are stored in the system as preparation for any future audit. A key requirement of the expert software system was access to future developments that can offer enhanced functionality of the well integrity platform through additional near time capabilities such as predictive erosion and corrosion for downhole flow wetted components. This is being developed to enhance workover scheduling for existing wells and material selection for new wells and is planned to update automatically critical well integrity criteria such as tubing burst, collapse and MAASP.


Author(s):  
Alex J. Baumgard ◽  
Tara L. Coultish ◽  
Gerry W. Ferris

Over the last 15 years, BGC Engineering Inc. has developed and implemented a geohazards Integrity Management Program (IMP) with 12 major pipeline operators (consisting of gas and oil pipelines and of both gathering and transmission systems). Over this time, the program has been applied to the assessment of approximately 13,500 individual hydrotechnical and geotechnical geohazard sites spanning approximately 63,000 km of operating pipelines in Canada and the USA. Hydrotechnical (watercourse) and geotechnical (slope) hazards are the primary types of geohazards that have directly contributed to pipeline failures in Canada. As with all IMPs, the core objectives of a geohazard management system are to ensure a proactive approach that is repeatable and defensible. In order to meet these objectives, the program allows for varying levels of intensity of inspection and a recommended timescale for completion of actions to manage the identified geohazards in accordance with the degree of hazard that the site poses to the pipeline. In this way, the sites are managed in a proactive manner while remaining flexible to accommodate the most current conditions at each site. This paper will provide a background to the key components of the program related specifically to existing operating pipeline systems, present pertinent statistics on the occurrence of various types of geohazards based on the large dataset of inspections, and discuss some of the lessons learned in the form of program results and program challenges from implementing a geohazard integrity management system for a dozen operators with different ages of systems, complexity of pipeline networks, and in varied geographic settings.


2021 ◽  
Author(s):  
Giorgio Ferrario ◽  
Salvatore Grimaldi

Abstract Capitalization of lessons learned on Asset Integrity Management during Front End Loading phases of a green field Project Development, by defining plan for implementation of a diagnostic digital tool for reducing downtime and introduce predictive maintenance during Operation. Eni developed a platform of Digital applications for enhanced Operations management by implementing an Integrated Asset Management (IAM) system. Advanced Analytics tool is part of it and is designed for monitoring, foreseeing and preventing production upsets and anomalies; the tool is set up by verification of areas of interest and criticalities, with identification of main equipment data sets and by the implementation and validation of predictive models. Starting from historical data, data scientists supported by experts develop algorithms capable of finding interdependencies between a set of input variables and an output variable (phenomenon to be predicted/monitored), thus detecting anomalies and criticalities. Main areas of benefit are envisaged on Production continuity, capable of predicting problems on static and rotating equipment and giving information on the most impacting variables on the incipient problems. The tool will support technicians to help them preventing failures and out-of-specs events which may cause loss of production or asset integrity issues, with the activation of predictive maintenance and the aim to strive a continuous monitoring and improvement of plant operational performances. An Energy Efficiency predictive model will also be set up, capable of forecasting the future energy performances of the asset through the prediction of the Stationary Combustion of Carbon Dioxide (CO2) emission index (t CO2/kbbl) and providing the list of the main influencing equipment and variables. The plan for implementation of the tool from the Early phases of development help the organization on prioritizing the implementation of Digital tools as part of the execution and realization of the Asset to be delivered to the Operational personnel, by easing the transition and avoiding subsequent retrofitting carrying brownfield works and additional costs. The implementation of Advanced Analytics tool has been embedded in a new green field initiative of a Development Project since Front End Loading phases, thus fostering digital implementation and minimizing deployment costs by including those as part of the Investment Proposal presented to Joint Venture Partners and Authorities.


2014 ◽  
Author(s):  
Sanjiv Kumar ◽  
Mohammed A. Al-Atwi ◽  
Abdulrahman K. Al-Mulhim ◽  
Mohammad A. Al-Otaibi ◽  
Mohammed S. Al-Mulhim ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document