The Research on Decommissioning and Abandonment Engineering Practice of Onshore Oilfield: A Case Study of Block 1/2/4 in South Sudan

2021 ◽  
Author(s):  
Qi Liu ◽  
Huifeng Liu ◽  
Xi Wang ◽  
WanJun Li ◽  
Guobin Yang ◽  
...  

Abstract At the end of the lifespan of this onshore oilfield development, all wells and oil production system, transmission pipelines and all surface infrastructures shall be decommissioned in accordance with international guidelines for abandonment of oil and gas facilities. The development and production period relevant to Block 1/2/4 shall be ceased in 2033 as the PSC law approved by South Sudan Government. Considering that South Sudan is located along the Nile River in Africa, necessary measures shall be taken with respect to activities in the field to ensure effective protection for the environment. In addition, difficulties which have negative impact on decommission assessment shall be taken into account, such as inadequate wells data, the destruction of the facility by war, high security risks of Block 1/2/4, costly decommissioning and abandonment fees and so on. This paper combines the practice of Block 1/2/4 in South Sudan to introduce the decommissioning plan, abandonment working process, standard operation procedure for wells and surface facility disposal, and the calculation of the decommissioning fund. The decommissioning may include complete removal or abandonment in-situ which based on an evaluation of cost, safety and environmental impact. While a detailed decommissioning and abandonment proposal has been compiled and updated during the production phase of the project. When the final decommissioning and abandonment plans have been developed for upstream and midstream, the costs have been updated accordingly. These estimates had utilized by the operators to fund the decommissioning and abandonment obligations in accordance with the provisions of the oil company. The D&A task was successful and finally approved by the authority of government. Due to the successful completion of the decommissioning task of Block1/2/4, a completed decommissioning and abandonment management system has been established, including D&A cost calculation and standard operation procedure for wells and facility disposal, which can lower the environmental risk and reduce the capital expenditure at the end of the project. It can be regarded as a classic practice in petroleum industry and has a strong reference value.

Humaniora ◽  
2016 ◽  
Vol 7 (1) ◽  
pp. 122
Author(s):  
Mariana Mariana ◽  
Heribertus Sunu Budihardjo

Research goal of this study was to know the program production process of Liputan Cilik DAAI TV in Jakarta. Method used in this study was a qualitative method with analysis participatory observation and in-depth interviews with the crew involved in this program. Result of this study finds that there are three stages of the program production process, they are pre production, production and post-production programs, and processes of SWOT analysis (Strength, Weakness, Opportuniy, Threats). This program has done production in accordance with the SOP (standard operation procedure) although it is aired on television non-commercial. This program does not only provide the entertainment, but also contains the elements education. 


2018 ◽  
Vol 4 (1) ◽  
Author(s):  
Dong Li ◽  
Yang An ◽  
Jianfang Zhao ◽  
Jing Wang ◽  
Xue Yuan

2017 ◽  
Vol 3 (6) ◽  
pp. 62
Author(s):  
Shahid Raza ◽  
Jalil Ahmad

LCL is operating an aerobic composting plant at Lahore that has been purchased from and installed by the Menart Composting Company, Belgium. Since municipal solid waste (MSW) in Lahore is heterogeneous a screening drum (MTR 1850) installed to screen the waste before composting with additional possibility for hand-sorting of recyclables in a sorting belt. This Standard Operation Procedure (SOP) has been prepared for and adopted by the composting plant of the Lahore Compost Ltd (LCL). The SOP intends to ensure that LCL adopts the identified best practices in the plant, operates it through standard recommended procedures; and takes necessary corrective actions when required


protocols.io ◽  
2020 ◽  
Author(s):  
Pengtao Jiao ◽  
Wenhui Fan ◽  
Wenjun Liu ◽  
Jing Li

2019 ◽  
Vol 30 (6) ◽  
pp. 1774-1776
Author(s):  
Songyu Chen ◽  
Ning Yang ◽  
Weiguo Li ◽  
Shujun Xu ◽  
Xingang Li ◽  
...  

HNO ◽  
2020 ◽  
Vol 68 (11) ◽  
pp. 838-846
Author(s):  
A. Pudszuhn ◽  
S. Voegeler ◽  
C. Berger ◽  
S. Treskatsch ◽  
S. Angermair ◽  
...  

Zusammenfassung Berichtet wird über die Erfahrungen mit einer interdisziplinären klinikinternen SOP (Standard Operation Procedure) zur Tracheostomie (TS) bei „Coronavirus-Disease“(COVID-19)-Patienten, unter Berücksichtigung der allgemeinen nationalen und internationalen Empfehlungen. Der interdisziplinär festgelegte operative Zeitpunkt der TS aufgrund einer prolongierten invasiven Beatmung und frustranen Weaning-Versuchen betraf Phasen sowohl hoher als auch niedriger Erkrankungsaktivität. Es wurden 5 TS bei Patienten mit einem Durchschnittsalter von 70,6 Jahren durchgeführt. Neben den Standard-COVID-19-Schutzmaßnahmen für das medizinische Personal zur Vermeidung einer nosokomialen COVID-19-Infektion führt die SOP-unterstützte Kommunikation während der TS zu einer periprozeduralen Sicherheit aller Beteiligten. COVID-19-Erkrankungen des medizinischen Personals der beteiligten Abteilungen sind bisher nicht bekannt.


Sign in / Sign up

Export Citation Format

Share Document