A STRATEGY FOR MONITORING THE IMPACTS OF COMBINED SEWER OVERFLOWS ON THE OHIO RIVER

1994 ◽  
Vol 30 (1) ◽  
pp. 167-175
Author(s):  
Alan H. Vicory ◽  
Peter A. Tennant

With the attainment of secondary treatment by virtually all municipal discharges in the United States, control of water pollution from combined sewer overflows (CSOs) has assumed a high priority. Accordingly, a national strategy was issued in 1989 which, in 1993, was expanded into a national policy on CSO control. The national policy establishes as an objective the attainment of receiving water quality standards, rather than a design storm/treatment technology based approach. A significant percentage of the CSOs in the U.S. are located along the Ohio River. The states along the Ohio have decided to coordinate their CSO control efforts through the Ohio River Valley Water Sanitation Commission (ORSANCO). With the Commission assigned the responsibility of developing a monitoring approach which would allow the definition of CSO impacts on the Ohio, research by the Commission found that very little information existed on the monitoring and assessment of large rivers for the determination of CSO impacts. It was therefore necessary to develop a strategy for coordinated efforts by the states, the CSO dischargers, and ORSANCO to identify and apply appropriate monitoring approaches. A workshop was held in June 1993 to receive input from a variety of experts. Taking into account this input, a strategy has been developed which sets forth certain approaches and concepts to be considered in assessing CSO impacts. In addition, the strategy calls for frequent sharing of findings in order that the data collection efforts by the several agencies can be mutually supportive and lead to technically sound answers regarding CSO impacts and control needs.

1999 ◽  
Vol 125 (4) ◽  
pp. 372-380 ◽  
Author(s):  
Daniel Sempere-Torres ◽  
Carles Corral ◽  
Jordi Raso ◽  
Pere Malgrat

2015 ◽  
Vol 10 (2) ◽  
pp. 282-290 ◽  
Author(s):  
V. Nasri ◽  
C. E. Haynes

The South Hartford Conveyance and Storage Tunnel is a major component of Hartford Metropolitan District's Clean Water Project. It is intended to capture and store combined sewer overflows from the southern portion of Hartford, CT, and sanitary sewer overflows from West Hartford and Newington, CT. The project is estimated to cost approximately $US500 M and will be constructed under multiple construction contracts. The project components include a deep rock tunnel 6.6 km long and 7.6 m excavated diameter, several kilometers of consolidation sewers, multiple hydraulic drop shafts with deaeration chambers and a 100 MLD pumping station for tunnel dewatering. The tunnel boring machine-bored tunnel will be excavated in shale, siltstone and basalt through several fault zones. An AECOM led team is currently performing the final design for the project.


1969 ◽  
Vol 3 (7) ◽  
pp. 531-543
Author(s):  
David W. Eckhoff ◽  
Alan O. Friedland ◽  
Harvey F. Ludwig

1996 ◽  
Vol 31 (3) ◽  
pp. 453-472 ◽  
Author(s):  
M. Stirrup

Abstract The Regional Municipality of Hamilton-Wentworth operates a large combined sewer system which diverts excess combined sewage to local receiving waters at over 20 locations. On average, there are approximately 23 combined sewer overflows per year, per outfall. The region’s Pollution Control Plan, adopted by Regional Council in 1992, concluded that the only reasonable means of dealing with large volumes of combined sewer overflow in Hamilton was to intercept it at the outlets, detain it and convey it to the wastewater treatment plant after the storm events. The recommended control strategy relies heavily on off-line storage, with an associated expansion of the Woodward Avenue wastewater treatment plant to achieve target reductions of combined sewer overflows to 1–4 per year on average. The region has begun to implement this Pollution Control Plan in earnest. Three off-line detention storage tanks are already in operation, construction of a fourth facility is well underway, and conceptual design of a number of other proposed facilities has commenced. To make the best possible use of these facilities and existing in-line storage, the region is implementing a microcomputer-based real-time control system. A number of proposed Woodward Avenue wastewater treatment plant process upgrades and expansions have also been undertaken. This paper reviews the region's progress in implementing these control measures.


1992 ◽  
Vol 26 (5-6) ◽  
pp. 1295-1304 ◽  
Author(s):  
C. Jefferies

Visible pollution discharged from two combined sewer overflows were studied using passive Trash Trap devices and the UK Water Research Centre Gross Solids Sampler. Relationships are presented for the number of visible solids and the mass of gross solids discharged during an event. The differences in the behaviour of the overflow types are reported on and they are categorised using the Trash Traps.


Sign in / Sign up

Export Citation Format

Share Document