Pilot Scale Evaluation of a Two-Stage, Low-Cost Low-Tech Class A Biosolids Treatment Process

2018 ◽  
Vol 2018 (4) ◽  
pp. 1132-1142
Author(s):  
Karina Eyre ◽  
Tanner Keyzers ◽  
Jennifer G Becker ◽  
Eric A Seagren ◽  
Christa Meingast
2000 ◽  
Vol 72 (4) ◽  
pp. 413-422 ◽  
Author(s):  
Prakasam Tata ◽  
Cecil Lue-Hing ◽  
James J. Bertucci ◽  
Salvador J. Sedita ◽  
George J. Knafl

2000 ◽  
Vol 2000 (9) ◽  
pp. 523-543
Author(s):  
Colin Brade ◽  
Dorian Harrison ◽  
Aidan Cumiskey ◽  
Mick Dawson

2013 ◽  
Vol 67 (1) ◽  
pp. 16-23 ◽  
Author(s):  
Yong H. Huang ◽  
Phani K. Peddi ◽  
Hui Zeng ◽  
Ci-Lai Tang ◽  
Xinjun Teng

The hybrid zero-valent-iron (hZVI) process is a novel chemical treatment process that has shown great potential in previous laboratory and field bench-top scale tests for removing selenium, mercury and nutrients from various industrial wastewaters. In this study, a pilot-scale demonstration was conducted to continuously treat 3.8–7.6 L/min (1–2 gpm) of the flue-gas-desulfurization (FGD) wastewater at a coal-fired power plant for five months. Results show that the hZVI process could simultaneously reduce selenate-Se from 1 to 3 mg/L to below 10 μg/L and mercury from over 100 μg/L to below 10 ng/L in compliance with the new stringent effluent discharge limits planned by the U.S. EPA for Se and Hg. A three-stage hZVI system with a combined hydraulic retention time of 12 h is sufficient for Se treatment, while a single-stage system can meet Hg treatment requirement. The successful pilot study demonstrated that the hZVI process is scalable and could be a reliable, low-cost, high-performance treatment platform with many application potentials, particularly, for solving some of the toughest heavy metal water problems.


2013 ◽  
Vol 67 (2) ◽  
pp. 239-246 ◽  
Author(s):  
Yong H. Huang ◽  
Phani K. Peddi ◽  
Hui Zeng ◽  
Ci-Lai Tang ◽  
Xinjun Teng

The hybrid zero-valent-iron (hZVI) process is a novel chemical treatment process that has shown promise for removing heavy metals and nutrients from industrial wastewaters. In this study, a pilot-scale demonstration was conducted to continuously treat 3.8–7.6 L/min (1–2 gpm) of the flue-gas-desulfurization (FGD) wastewater at a coal-fired power plant for 5 months. In this paper, a spike test was conducted to evaluate performance of the hZVI process for removing selected toxic metals at artificially elevated concentrations. The results showed that a multiple-stage hZVI process could decrease selenate-Se from 22 mg/L to ∼10 μg/L and dissolved Hg2+ from 1.15 mg/L to ∼10 ng/L. In addition, the process simultaneously removed a broad spectrum of heavy metals such as As(III), As(V), Cr(VI), Cd(II), Pb(II) and Cu(II) from mg/L to near or sub-ppb (μg/L) level after a single-stage treatment. The process consumed about 0.3 kg ZVI per 1 m3 FGD wastewater treated at a cost of about US$0.6/m3. Solid waste production and energy consumption were reasonably low. The successful pilot study demonstrated that the hZVI technology can be a low-cost, high-performance treatment platform for solving some of the toughest heavy metal water problems.


2010 ◽  
Vol 13 (1-3) ◽  
pp. 128-136 ◽  
Author(s):  
Liat Birnhack ◽  
Roni Penn ◽  
Shaul Oren ◽  
Orly Lehmann ◽  
Ori Lahav

Sign in / Sign up

Export Citation Format

Share Document