Understanding Public Response to Nuclear Power Plant Protective Actions

2010 ◽  
Vol 1 (3) ◽  
pp. 33-59
Author(s):  
Fotini Walton ◽  
Brian Wolshon
2021 ◽  
Author(s):  
T. Schneider ◽  
J. Lochard ◽  
M. Maître ◽  
N. Ban ◽  
P. Croüail ◽  
...  

Lessons from the Fukushima-Daiichi nuclear power plant accident emphasize the difficulties for restoring the socio-economic activities in the affected areas. Among them, a series of radioligical protection challenges were noted, in particular concerning the protection of employees, the securing of the production and the guarantee provided to consumers of the radiological monitoring of products to restore their confidence. Based on case studies reporting the experience of employers deploying their activities in affected areas, an analysis of these radiological protection challenges has been performed. Characterizing the radiological situation was not always straightforward for the managers. With the help of radiological protection experts, protective actions have been identified and specific efforts have been devoted to provide information to employees and their families helping them to make their own judgement about the radiological situation. Respecting the decisions of employees and developing a radiological protection culture among them have proved to be efficient for restoring the business activities. Continuing or restoring the production not always manageable. It requires to develop dedicated radiological monitoring processes to ensure the radiological protection of workers and the quality of the production. Re-establishing the link with the consumers and organising the vigilance on the long-term were necessary for companies to maintain their production or develop new ones. Deploying a socio-economic programme for ensuring the community resilience in affected areas requires the adoption of governance mechanisms respecting ethical values to ensure the overall objective of protecting people and the environment against the risks of ionizing radiation and contributing to provide decent living and working conditions to the affected communities. It is of primary importance to rely on the involvement of local communities in the elaboration and deployment of the socio-economic activities with due considerations for ensuring the integrity of the communities, and respecting their choices.


Author(s):  
André Silva de Aguiar ◽  
Seung Min Lee ◽  
Gaianê Sabundjian

Through a severe accident at nuclear power plant Angra 2, the whole body dose effective of the individuals members of the public located in the Emergency Planning Zones (EPZs) will be calculated, and later, the protective actions in these EPZs will be analyzed. Two different scenarios of radionuclide release into the atmosphere will be considered. In the first scenario, 2 h of the release of Xe, Cs, Ba, and Te, and the second scenario, 168 h of release.


2020 ◽  
Vol 39 (5) ◽  
pp. 6339-6350
Author(s):  
Esra Çakır ◽  
Ziya Ulukan

Due to the increase in energy demand, many countries suffer from energy poverty because of insufficient and expensive energy supply. Plans to use alternative power like nuclear power for electricity generation are being revived among developing countries. Decisions for installation of power plants need to be based on careful assessment of future energy supply and demand, economic and financial implications and requirements for technology transfer. Since the problem involves many vague parameters, a fuzzy model should be an appropriate approach for dealing with this problem. This study develops a Fuzzy Multi-Objective Linear Programming (FMOLP) model for solving the nuclear power plant installation problem in fuzzy environment. FMOLP approach is recommended for cases where the objective functions are imprecise and can only be stated within a certain threshold level. The proposed model attempts to minimize total duration time, total cost and maximize the total crash time of the installation project. By using FMOLP, the weighted additive technique can also be applied in order to transform the model into Fuzzy Multiple Weighted-Objective Linear Programming (FMWOLP) to control the objective values such that all decision makers target on each criterion can be met. The optimum solution with the achievement level for both of the models (FMOLP and FMWOLP) are compared with each other. FMWOLP results in better performance as the overall degree of satisfaction depends on the weight given to the objective functions. A numerical example demonstrates the feasibility of applying the proposed models to nuclear power plant installation problem.