scholarly journals The Use of Earned Value in Forcasting Project Durations

Author(s):  
Osama Moselhi
Keyword(s):  
Controlling ◽  
2005 ◽  
Vol 17 (10) ◽  
pp. 573-582 ◽  
Author(s):  
Ralf Kesten
Keyword(s):  

2021 ◽  
pp. 1-14
Author(s):  
Seyed Taha Hossein Mortaji ◽  
Siamak Noori ◽  
Morteza Bagherpour

Earned value management is well-known as the most efficient method of project monitoring and control providing relatively reliable information about the project performance. However, this method requires accurate estimates of the progress of project activities, which are always associated with uncertainties that, if ignored or not addressed well, lead to incorrect results. To address this issue, the application of multi-valued logic, in particular fuzzy logic, in earned value management has recently attracted a lot of attention both in practice and research. This paper introduces directed earned value management (DEVM) in which ordered fuzzy numbers are used to express the so-called uncertainties as well as to capture more information about the trend of the project progress. To evaluate the performance of the proposed method, several numerical examples and a case study are presented. The results reveal that compared to the existing methods, DEVM has a lower computational complexity. Also, it doesn’t suffer from the overestimation effect and as a result, it has a higher ability to express project-specific dynamics. In sum, the proposed method allows project managers to make informed decisions that lead to taking preventive and corrective actions promptly and at a lower cost.


Sign in / Sign up

Export Citation Format

Share Document