'The Women Do the Machinery': Craft, Gender and Work Transformation in the Brisbane Boot Trade, 1869-95

2004 ◽  
pp. 75
Author(s):  
Bradley Bowden ◽  
Toni Bowden
1994 ◽  
Vol 74 (1) ◽  
pp. 115-123 ◽  
Author(s):  
Kim A. Burley

This study examined the relationships among gender, coping, and anticipated work-family conflict for career-bound men and women. 256 university students enrolled in a university in northern Louisiana participated. Multivariate and univariate analyses were used to examine (a) potential gender differences with respect to anticipated work-family conflict and work-family coping mechanisms and (b) the role coping processes may play in mediating the relationship between gender and anticipated work-family conflict. The results indicated significant differences between the sexes with respect to anticipated work-family conflict as well as to expected use of various coping strategies to manage anticipated work-family conflict. Contrary to expectations, coping strategies did not mediate the relationship between gender and work-family conflict. The issue of coping as a mediator variable as well as the study's primary implications for students and professional educators are addressed.


2012 ◽  
Vol 134 (2) ◽  
Author(s):  
George Platanitis ◽  
Remon Pop-Iliev ◽  
Ahmad Barari

This paper proposes the use of a design structure matrix/work transformation matrix (DSM/WTM)-based methodology in academic settings to serve engineering educators as a facilitating tool for predetermining the difficulty and feasibility of design engineering projects they assign, given both the time constraints of the academic term and the expected skill level of the respective learners. By using a third-year engineering design project as a case study, engineering students actively participated in this comprehensive use of DSM methodologies. The engineering design process has been thoroughly analyzed to determine convergence characteristics based on the eigenvalues of the system followed by a sensitivity analysis on the originally determined DSM based on data provided by students in terms of task durations and number of iterations for each task. Finally, an investigation of the design process convergence due to unexpected events or random disturbances has been conducted. The obtained predictive model of the design process was compared to the actual dynamics of the project as experienced by the students and the effect of random disturbances at any point in the design process has thereby been evaluated.


Sign in / Sign up

Export Citation Format

Share Document