scholarly journals Case Study: Maintenance Proposal of Press Parts Production for Minimize Waste by Lean Manufacturing – Value Stream Mapping (VSM)

INSIST ◽  
2017 ◽  
Vol 1 (1) ◽  
Author(s):  
Dessy Agustina Sari ◽  
Sukanta Sukanta

Abstract—Higher competition in businesslike field demanded each company acted as a value creator with progressive fixing performance. One of effort in increasing productivity was reducing waste. Enterprise T have seven type of extravagance were over production, transportation, inventory, over processing, motion waiting and defect. Minimize waste have bond with production time which could increase efficiency on using electricity and decreased lead time. Production process in this company showed non-value added time such as excessively material transportation in picking area and so the workers too much waited for the next schedule activity. This condition caused higher product lead time. Lean manufacturing idea necessary was implemented with using tool Value Stream Mapping – VSM. This strategy would resumed for the company maintenance and the result showed that lacking as much 26,45% of lead time could be a problem solution. Reducing lead time could be higher if the company have applied and played continue improvement.Keywords—lead time, lean manufacturing, value stream mapping.

INSIST ◽  
2017 ◽  
Vol 2 (1) ◽  
pp. 6
Author(s):  
Dessy Agustina Sari ◽  
Sukanta Sukanta

Abstract—Higher competition in businesslike field demanded each company acted as a value creator with progressive fixing performance. One of effort in increasing productivity was reducing waste. Enterprise T have seven type of extravagance were over production, transportation, inventory, over processing, motion waiting and defect. Minimize waste have bond with production time which could increase efficiency on using electricity and decreased lead time. Production process in this company showed non-value added time such as excessively material transportation in picking area and so the workers too much waited for the next schedule activity. This condition caused higher product lead time. Lean manufacturing idea necessary was implemented with using tool Value Stream Mapping – VSM. This strategy would resumed for the company maintenance and the result showed that lacking as much 26,45% of lead time could be a problem solution. Reducing lead time could be higher if the company have applied and played continue improvement.Keywords—lead time, lean manufacturing, value stream mapping.


Author(s):  
V. Saravanan ◽  
S. Nallusamy ◽  
Abraham George

Productivity is an important parameter for all small and medium scale manufacturing industries. Lean manufacturing emerged as production strategy capable of increasing productivity by identifying and eliminating non value added activities. This article deals with productivity improvement in a pre-assembly line of gearbox manufacturing company with a case study using lean concepts like process flow chart, process Gantt chart and time study. This paper illustrates using a case study on how a value stream mapping has to be carried out in a planet carrier pre-assembly line. Value stream mapping and work standardization are the key tools used in lean manufacturing and lean transformation. It makes the process smoother, helps in reduction of lead time and ultimately increasing the productivity. From the observed results it was found that, the productivity has been increased from 7 pieces to 10 pieces in the first step assembly when the proposed VSM was implemented. The second step processing time was reduced by the execution of proposed value stream mapping with TAKT time of 126 minutes and 165 minutes of processing time for demand of 10 pieces were achieved and the overall processing time has been reduced by about 24%.


2019 ◽  
Vol 5 (1) ◽  
pp. 1-7
Author(s):  
Catur Kusbiantoro ◽  
Ellysa Nursanti

CV. Tanara Textile merupakan salah satu perusahaan tekstil yang termasuk dalam kelompok industri penyempurnaan kain berupa kain kaos. Pada proses produksi di perusahaan masih ditemukan beberapa waste. Penelitian ini bertujuan untuk mengidentifikasi dan menurunkan waste yang terjadi pada proses produksi maka digunakan pendekatan lean manufacturing. Metode Value Stream Mapping (VSM) digunakan untuk pemetaan aliran produksi dan aliran informasi terhadap suatu produk pada tingkat produksi total, melakukan wawancara untuk pembobotan penyebab 7 waste yang sering terjadi pada proses produksi, VALSAT untuk menganalisa pemborosan dari hasil pembobotan yang selanjutnya melakukan detailed mapping tools, serta analisis FMEA untuk mengetahui penyebab kegagalan prosesyang terjadi di lini produksi lalu menghitung nilai RPN tertinggi. Selanjutnya melakukan usulan perbaikan untuk menurunkan waste unnecessary inventory serta menganalisis perbaikan secara berkelanjutan dengan PDCA. Waste terbesar ada pada Unncessary Inventory sebesar 28,571% faktor penyebabnya adalah penumpukan bahan baku, work in process (WIP), sparepart yang tidak terpakai dan penimbunan pada finished goods Sebelum perbaikan proses produksi 16 hari 9 jam dimana Value Added 6 hari 4 jam dan Lead Time 10 hari 4 jam, setelah perbaikan proses produksi menjadi 14 hari 5 jam dimana Value Added 6 hari 4 jam dan Lead Time 8 hari 1 jam, dengan demikian dapat meningkatkan process cycle efficiency sebesar 17,19% dan menghemat lead time sebesar 2,546% dengan penurunan waste sebesar 8,31%


2011 ◽  
Vol 110-116 ◽  
pp. 2062-2066 ◽  
Author(s):  
Paramdeep Singh ◽  
Harpuneet Singh

Lean manufacturing has been proved to be an effective management philosophy for improving businesses in a competitive market by eliminating non-value added waste and improving in process operations. Value stream mapping is an important tool used to identify the opportunities for various lean techniques. The present research mainly focuses on the description of a model that is developed to contrast the “before” and “after” scenarios in detail in order to obtain the various benefits such as reduced production lead time, lower work in process inventory [1] and proper utilisation of the workforce. The current manufacturing system has been compared with the proposed pull (Kanban) system which shows the benefits of the proposed lean manufacturing system over the existing traditional manufacturing system. The present research work has been carried out at typical tractor industry which shows 50.5% reduction in total lead time in the future state value mapping of the crank case and the number of operators involved in processing of crank case has also been reduced from 22 to 18.


2018 ◽  
Vol 220 ◽  
pp. 02005
Author(s):  
Abdillah Arif Nasution ◽  
Ikhsan Siregar ◽  
Anizar ◽  
Tigor Hamonangan Nasution ◽  
Khalida Syahputri ◽  
...  

This research was conducted in manufacturing industry, so this research is based on case study application. This research serves to reduce waste in the industry when making a product. This study categorizes value-added work and which work has no added value. And it is measurable and has value, so it can be evaluated in the future. Later this will be poured or depicted on a map called Value stream mapping. This is a tool from Lean Manufacturing. Lean manufacturing is useful for analysing and reducing non value-added activities, value stream mapping analysis tools, 5L1H process mapping activities, and 5 why tools. From the results of this study obtained the efficiency of the process cycle and total estimation of the improvement of the lead time. This calculation can be an evaluation material for the company.


2016 ◽  
Vol 14 (2) ◽  
pp. 299 ◽  
Author(s):  
Wahyu Adrianto ◽  
Muhammad Kholil

Engine maintenance strives to always improve its service excellence with tools such as gate system where the system is expected to realize the lead time for 60days. In the implementation of the gate system is still not able to meet the expected target. During maintenance or overhaul the engine is still encountered waste or waste that causes the target cannot be met. Lean Manufacturing is an approach that aims to minimize waste that occurs in the process flow.Understanding the conditions of the process described in Value Stream Mapping for further elaborate activities that have the value-added and non-value added.Through seven waste concept, then be weighted to determine the most dominant type of waste.From the data processing is obtained that through the Value Stream Mapping is known gate 1 and gate 3 is the point that there are many wastes. Weighting and ranking of seven existing waste in the process of the activity obtained results in the form of a waste critical sequence of seven existing waste. Highest weights on the type of waste waiting with a weight of 0.38. Results of Root Cause Analysis in mind that the root cause of waste waiting for that data is maintained, the lack of attention to people development, There are still bugs in the system and miscommunication.


ICCD ◽  
2019 ◽  
Vol 2 (1) ◽  
pp. 123-126
Author(s):  
Zulfa Fitri Ikatrinasari ◽  
Kosasih Kosasih ◽  
Nico Alexander Vizano

Value stream mapping (VSM) is one of the tools in Iean manufacturing that can be used to improve the efficiency of a company. VSM can describe material flow and information flow from upstream to downstream, from suppliers to consumers. VSM can be used to identify waste through sorting each activity into value-added or non-value-added activities. VSM training that begins with providing understanding of the concept of lean manufacturing is expected to increase the ability of workers to improve and enhance the performance of their companies. This training gives good results, seen from the results of discussions and presentations of each group in a given case study


2017 ◽  
Vol 11 (1) ◽  
pp. 23-30
Author(s):  
An Apriyani Tebiary ◽  
I Ketut Suastika ◽  
Buana Ma'ruf

Competition of shipyard industry market in this globalization era encourages companies to realize the importance of improving the effectiveness and efficiency so that, able to compete in terms of quality, cost and on time delivery. Production effectiveness is one effort that must be achieved by a shipbuilding industry to survive amid the competition in seizing market share. Production effectiveness is done with the aim of producing economically, continuously and on time to the customer, so that the company's survival can be guaranteed. This study aims to identify the activities that are classified as waste in the process of ship building at PT. Dumas Tanjung Perak Shipyard Surabaya so as to minimize production time in shipyard industry. The results showed the effectiveness of PT. DUMAS currently reaches 84.96%. In the process of improvement with the application of value stream mapping effectiveness value reached 92%. The conclusion of this research is a value stream mapping method can be applied measuring instrument and can describe the flow of production process in shipyard so that can explain in detail activity that give value added or non value added activity.


2015 ◽  
Vol 789-790 ◽  
pp. 1283-1286
Author(s):  
Orapadee Joochim ◽  
Siripong Jungthawan

The purpose of this paper is to increase the productivity of a ceramic tile manufacturing process using lean manufacturing technique. The current system of the ceramic tile manufacturing process has been mapped using Value Stream Mapping (VSM) tool, which is a lean manufacturing tool and the wastages in the current system are identified. Afterwards, future state has been created by using VSM tool, which has enhanced process ration by decreasing maximum possible waste in the manufacturing process. The case study demonstrates how the VSM tool has been used to identify and reduce waste in the manufacturing process by 26%, unnecessary inventory by 8.33% and working time of the color-mixing department by 21.57%. This flexibility enhancement causes 2.67% shorter lead time, 2.70% higher value-added ratio and frequent product delivery leading to more profits.


2014 ◽  
Vol 575 ◽  
pp. 905-909 ◽  
Author(s):  
Mohd Norzaimi Che Ani ◽  
Mohd Adib Razali ◽  
Kauthar A. Rhaffor

This paper presents the application of the Value Stream Mapping (VSM) as improvements tools at selected case study industry. A VSM process is the transformation of raw materials into finished goods and considered interaction of information, operators, machines and materials. The objectives of this project are to study critical wastes in production line and to recommended new design layout based on Lean Manufacturing techniques. Lean is about performance more with minimized the time, inventory, space, labor, and money. The tool of VSM used in this project successfully achieved its objectives to identify waste and proposing the solution for regarding problems. The lead time was reduced by half, the value added ratio was increased drastically and the cycle time was improved by minimize the handling time. VSM was a magical tool that cans reveals of all the data, problem, process, operation and overall flow of processes to make a certain product.


Sign in / Sign up

Export Citation Format

Share Document