schedule activity
Recently Published Documents


TOTAL DOCUMENTS

6
(FIVE YEARS 1)

H-INDEX

1
(FIVE YEARS 0)

2019 ◽  
Vol 10 (2) ◽  
pp. 56
Author(s):  
Agustinus Catur Trinugroho

The objective of this research was to know the effort of Paguyuban Kristen Jawi Pontianak maintain collective consciousness, religious ties and social ties. The research used descriptive method and qualitative approach. The techniques of data collection were observation, interview and the study of documentation. The research instruments were the directive of observation, directive of interview, and the documentation tools. This research showed that collective consciousness of the gemeinschaft is already. There is effort done maintain the collective consciousness as for mutually coordinate and worship priority.  This religious tie of the gemeinschaft is good enough. There is effort done maintain the religious tie is get the religous vacation on specific moments that run every year. Social tie of the gemeinschaft was good. There is effort done maintain the social tie as run with instilling tolerance to gemeinschaft members and set the schedule activity and then run that as consistance.


Author(s):  
Khairul Anwar Hafizd ◽  
Melda Aolia

  Angkasa Pura Digital Signage at PT Angkasa Pura I (Persero) Syamsudinnor Airport Banjarmasin has used web application in inputting pictures and video, but information about schedule activity still done manually, that is done in writing. Therefore it is necessary to create an information system schedule activities, images, video and attendance using PHP employees who have previously been designed using ERD, DFD and Flowchart. The information system that has been created can input the schedule of activities, pictures, videos and attendance of employees displayed through digital signage or displayed through LCD or monitor screen.


INSIST ◽  
2017 ◽  
Vol 2 (1) ◽  
pp. 6
Author(s):  
Dessy Agustina Sari ◽  
Sukanta Sukanta

Abstract—Higher competition in businesslike field demanded each company acted as a value creator with progressive fixing performance. One of effort in increasing productivity was reducing waste. Enterprise T have seven type of extravagance were over production, transportation, inventory, over processing, motion waiting and defect. Minimize waste have bond with production time which could increase efficiency on using electricity and decreased lead time. Production process in this company showed non-value added time such as excessively material transportation in picking area and so the workers too much waited for the next schedule activity. This condition caused higher product lead time. Lean manufacturing idea necessary was implemented with using tool Value Stream Mapping – VSM. This strategy would resumed for the company maintenance and the result showed that lacking as much 26,45% of lead time could be a problem solution. Reducing lead time could be higher if the company have applied and played continue improvement.Keywords—lead time, lean manufacturing, value stream mapping.


INSIST ◽  
2017 ◽  
Vol 1 (1) ◽  
Author(s):  
Dessy Agustina Sari ◽  
Sukanta Sukanta

Abstract—Higher competition in businesslike field demanded each company acted as a value creator with progressive fixing performance. One of effort in increasing productivity was reducing waste. Enterprise T have seven type of extravagance were over production, transportation, inventory, over processing, motion waiting and defect. Minimize waste have bond with production time which could increase efficiency on using electricity and decreased lead time. Production process in this company showed non-value added time such as excessively material transportation in picking area and so the workers too much waited for the next schedule activity. This condition caused higher product lead time. Lean manufacturing idea necessary was implemented with using tool Value Stream Mapping – VSM. This strategy would resumed for the company maintenance and the result showed that lacking as much 26,45% of lead time could be a problem solution. Reducing lead time could be higher if the company have applied and played continue improvement.Keywords—lead time, lean manufacturing, value stream mapping.


ASHA Leader ◽  
2013 ◽  
Vol 18 (8) ◽  
pp. 40-45 ◽  
Author(s):  
Judy Rudebusch ◽  
JoAnn Wiechmann

To offer a full range of RTI and IEP services, school-based SLPs can schedule activity blocks rather than go student by student—here's how.


2003 ◽  
Vol 21 (4) ◽  
pp. 163-168 ◽  
Author(s):  
R. Riccioni ◽  
F. Caracciolo ◽  
S. Galimberti ◽  
N. Cecconi ◽  
M. Petrini

Sign in / Sign up

Export Citation Format

Share Document