scholarly journals Analysis of the Benefits of Implementation of IPD for Construction Project Stakeholders

2020 ◽  
Vol 6 (8) ◽  
pp. 1609-1621 ◽  
Author(s):  
Mahdi Alinezhad ◽  
Ehsan Saghatforoush ◽  
Zahra Kahvandi ◽  
Christopher Preece

The greatest challenges for construction infrastructure projects are those related to increasing problems of managing the time and cost in project implementation. For many years, new methods have been used to reduce the problems to do with separation of design from the implementation stage. An important point is that all projects tend to require integration; however, it has been observed that construction projects usually enjoy the benefits and capacities of updated methods and technologies later than other industries. One of these approaches, which have been growing in developed countries for some time, is using the Integrated Project Delivery (IPD) approach. Using such an approach has various benefits, but also would seem to pose significant challenges. To-date, it and has not still achieved success in terms of legal recognition and wider implementation. The aim of this study is to extract the benefits of the implementation of the IPD approach using an in-depth literature review. Then descriptive analysis is applied to identify the benefits of IPD. The benefits of applying this approach for key construction project stakeholders are classified using pattern analysis. This study has offered a framework in order to present available generic and specific benefits to each project stakeholder, and it provides the required motivation for project owners to use and implement it in their future projects. Moreover, they should understand the important factors that lead to IPD adoption. They can use this information to develop a contractual framework to make it more effective.

2016 ◽  
Vol 2016 ◽  
pp. 1-7 ◽  
Author(s):  
William Paolillo ◽  
Branka V. Olson ◽  
Edward Straub

People-centered innovation is a paradigm shift in the construction industry. It is derived from the supposition that people not methods, schedules, or budgets deliver projects. Our data suggest that a multilevel, multidisciplinary project team through shared vision, values, and a common vernacular defines, designs, and delivers more successful projects than traditional methods. These projects meet the needs of shareholders, the community, stakeholders, and the planet. We employ the concepts of emotional intelligence and agency theory to explain an integrated project delivery (IPD) construction project using lean tactics that not only delivered, but also exceeded expectations resulting in a six-month schedule acceleration and $60M savings over the original estimated cost of the project calculated assuming traditional project delivery methods. The safety rating for this project was 50% better than the national average and the expected improvement in operating margin for the new building is 33% greater. This paper introduces the notion of people-centered innovation to an industry that has struggled to adapt and show positive results over recent decades. Our case study describes the significance of people-centered innovation in construction project delivery. We discuss the implications for the construction industry going forward.


Author(s):  
Rita Awwad ◽  
Stephanie Atallah ◽  
Carol Menassa

The high cost incurred by the resolution of conflicts is largely affected by the existing adversarial nature of the construction industry along with the use of non-efficient dispute resolution methods in construction projects. This paper studies opinion dynamics in the negotiation of construction disputes while trying to understand the behavior and extremism of each contractual party. The developed model uses an agent-based approach to show how each agent’s attitude can influence the negotiation process when solving a dispute. It can also be used to highlight the importance of alternative dispute resolution (ADR) methods and the use of a mediator in helping parties initiate negotiation and decrease the number of negotiation cycles needed to converge. The results showed that negotiation is not only affected by the attitude and character of the agents involved but it is also influenced by the delivery method of the project and the level of intensity of each agent. It was found that when the project is delivered through an Integrated Project Delivery (IPD) method, parties are more flexible and cooperative and will reach agreement within few negotiation cycles.


2019 ◽  
Vol 50 (2) ◽  
pp. 128-143 ◽  
Author(s):  
Daniel M. Hall ◽  
W. Richard Scott

Integrated project delivery (IPD), an emerging form of project organization for North American construction projects, offers a compelling case study to understand how new innovative infrastructure project delivery models can emerge and institutionalize. This article frames the early stages of IPD through the actions of an institutional entrepreneur—Sutter Health—working to construct a new arrangement for the delivery of its large healthcare projects. The resulting account uses Suchman’s (1995) multistage model of institutionalization to understand the early-stage actors, processes, conditions, and actions present for creation of an innovative delivery model within a fragmented, project-based industry context.


2012 ◽  
Vol 166 (4) ◽  
pp. 146-158
Author(s):  
Krzysztof ZIMA

The article discusses the problems of today's construction project management. Despite the implementation of modern technologies and building materials, and the use of software to support engineering analysis and decision-making in construction, efficiency gradually decreases. The article describes a new concept of integrated construction project management (Integrated Project Delivery) and compares it with the previously used management methods, such as Design-Bid-Build and Design & Build. The article also shows the problems associated with the flow of information during the completion of a construction project and the benefits of integrated construction project management in conjunction with the BIM (Building Information Modelling) technology. The article also describes the world's most popular format for data exchange between different software: IFC (Industry Foundation Classes), which allows exchanging information on many aspects of a construction project.


2019 ◽  
Vol 6 (1-2) ◽  
pp. 83-90
Author(s):  
Rozana Mohamed Salleh ◽  
Nur Emma Mustaffa ◽  
Nafisah Abdul Rahiman ◽  
Hamizah Liyana Tajul Ariffin ◽  
Norazam Othman

The Building Information Modelling (BIM) implementation is to create a centralised knowledge sharing resource that contains all the necessary design and operational information about the project. BIM is a collaborative approach and integrated project delivery to design and delivery embraced by various construction teams in the construction projects. In the context of the most suitable project delivery to be used, with regards to the use of BIM, the Integrated Project Delivery (IPD) approach is highlighted as the best method which correlates building procurement of the design-to-construction business process through literature review analysis. IPD is developed as project delivery system that integrates people in effective collaborative approach between the key players in the project. IPD is going to be particularly beneficial for BIM because the contracts relation between the contractor, designers, consultants, constructors, sub-contractors and suppliers were binded and expressly determined at earlier stage. This relationship between these two subjects will helped the project team to achieve the project goals in terms of timely schedule, life cycle costs, quality and sustainability in construction project. Therefore, this study investigates on the propensity of the best methodology of project delivery system which can correlate with procurement adoption for projects adapt BIM concept. This is a descriptive study and the method used is based on review of the literature in relation to BIM and IPD. The analysis revealed that propensity of adopting IPD project delivery and the adoption of BIM are based on these factors: improve the communication, closer collaboration; liability and legal relationships are specifically determined, the best quality outcome; and lastly with reductions in design and construction period, it provides a cost effectiveness and a saving in overall construction period.


2021 ◽  
Vol 26 ◽  
pp. 902-921 ◽  
Author(s):  
Manas Khanna ◽  
Faris Faris Elghaish ◽  
Stephen McIlwaine ◽  
Tara Tara Brooks

Alternative project delivery approaches have been proposed to overcome the inefficiencies of conventional delivery methods such as design-bid-build. Integrated Project Delivery (IPD) has recently emerged as a feasible substitute to traditional project delivery approaches. Despite widespread awareness of the benefits of IPD in integration with information and communication technology (ICT) to enhance the delivery of construction projects, IPD implementation has so far been sluggish in developing countries such as India. The feasibility of implementing IPD approach and applying its principles is investigated in this study. It assesses the maturity of delivery techniques, and the potential benefits and limitations of using IPD for infrastructure projects in developing countries, using India as a case study. This study has been carried out using an in-depth investigation of the literature in combination with a qualitative method involving interviews with ten highly experienced BIM professionals from the Indian AEC sector. The findings of this study have revealed that adopting integrated project delivery while leveraging the BIM process in conjunction with ICT has the potential to effectively deliver mega infrastructure projects in developing countries. The resistance to change, lack of experience and skills, and lack of awareness among project owners are recognized as the primary obstacles to IPD adoption. The main benefits for practice following adoption could include enhanced project delivery, more effective coordination among stakeholders, and greater transparency with cost and time savings through all stages of the project. It is recommended that the regulatory bodies establish governing standards and frameworks, amend regulations to accept IPD concepts, and upskill the workforce through training and knowledge transfer for its successful adoption. One novel aspect of this study may be recognized since most previous research has focused on limitations, benefits, and adoption frameworks for IPD whereas there has been no definitive study on the practicality of IPD combined with BIM and the use of ICT for successful infrastructure project delivery in developing countries. This study contributes to the body of knowledge by serving as an exemplary paper for future studies on the adoption of BIM and ICT approaches such as cloud computing, blockchain, IoT, and mixed realities to deliver projects with integrated project delivery. Furthermore, it provides a deeper understanding of the future of this delivery approach in developing nations.


Buildings ◽  
2019 ◽  
Vol 9 (9) ◽  
pp. 191 ◽  
Author(s):  
Samad M. E. Sepasgozar ◽  
Reyhaneh Karimi ◽  
Sara Shirowzhan ◽  
Mohammad Mojtahedi ◽  
Sabbar Ebrahimzadeh ◽  
...  

Delay is one of the main challenges of construction projects, and there is still much to overcome in order to reach near zero delay in all construction projects. This project aims to conduct a systematic critical review including a bibliography analysis on delay literature in construction. The main questions consider what has been learnt from a decade investigating delay causes and effects in the construction literature and what factors have been missed in the literature. This paper also presents a new and challenging question regarding how digital tools and associated technologies may prevent any delay in construction projects, which can change the research direction from delay investigations to identifying prevention factors. The paper identifies the delay dataset, including 493 papers investigating delay in construction, and establishes a specific dataset of papers focusing on delay effects and causes (DEC), including 94 selected papers covering different factors examined in over 29 countries such as Iran, India, Turkey, Bangladesh, Saudi Arabia, the United Arab Emirates (UAE), Cambodia, Oman, Malaysia, Taiwan, China, Vietnam, the US, the UK, and Egypt. In addition, the paper identifies 30 critical factors with the frequency of occurrences over three times in the DEC dataset and computes their medians of ranking. This paper also discusses digital tools and methods that can be used for delay analysis and preventions, including MS Project, Oracle Primavera P6, and Open Plan by Deltek. The paper discusses the project schedule delay analysis from project management methodology perspectives. It also discusses the current method’s limitations and future directions, which are based on the identification of the deficiency areas. In total, four overlooked factors are identified and suggested, including faulty data analysis, unmatched structure of the research questionnaires with new knowledge and standards [e.g., Project Management Body of Knowledge (PMBOK)], overlooked effects of digital technologies [e.g., Digital twin, Navisworks, Building Information Model (BIM), Geographic Information System (GIS), and Integrated Project Delivery (IPD)], and ignored job-site technologies. In addition, the paper presents the DEC model for future studies, including four main key factors. These factors are resources (e.g., project budgets, labour, material, equipment, and digital tool), project context, stakeholders performance (e.g., owner/client, consultant/designer, contractor, vendor/supplier), and external factors (e.g., ground condition, site location, regulation, natural disaster), which may significantly affect delay prevention and should be concurrently considered in the future delay investigations, since they may be required for designing an effective mitigation strategy when these proof points are identified. This would significantly help to utilise digital systems to prevent time overruns in different construction contexts.