scholarly journals Tourist Village Development Penta Helix Based the Analytical Hierarchy Process Approach

Author(s):  
Danang Wahyudi ◽  
Erni Ummi Hasanah ◽  
Arif Zulkarnain
2016 ◽  
Vol 20 (2) ◽  
pp. 69-82
Author(s):  
W. Suprihatin ◽  
H. Hailuddin

The background of the problems in this study is the decreasing quality of Sade hamlet amid rising tourist arrivals. From the environmental aspect, the conditions of the hamlet began to decline, in which the initial pattern of Sade has started a lot of changes towards the deficient and began to leave the local tradition. One effort to improve the condition of Sade hamlet in social, cultural and the environmental aspect is through the formulation of a sustainable structuring, the presence and identity maintaining and making a sustainable Tourism Village. Through analysis of AHP (Analytical Hierarchy Process) by collecting the perceptions of some experts through interviews and questionnaires, obtained by weighting the priority of the experts, namely the preservation of culture as an element of priority-level goals to be achieved in the development of Sade Hamlet as a tourist village at 0,476. While the determination of the level of the main criteria in the achievement of these objectives is the highest weight while maintaining a typical village environment at 0.319. Priority strategies that get the highest weight of the experts is that Sade Hamlet Revitalization with a priority weighting of 0.583. The second priority is the relocation of Hamlet at 0.235. Lowest weighting or last priority is Replication Sade Hamlet at 0.182.


Author(s):  
Novel Ridwan ◽  
Leksmono S. Putranto

The length of National roads in Banten Province along 564 kilometers is spread in several regencies and cities in the Banten region. In managing road implementation, adequate resources are needed so that prompt and appropriate action can be taken to reduce complaints from road users / communities. Implementation of road handling carried out by service providers with a conventional contract system must be done through a procurement process that goes through procedures based on applicable laws and regulations, namely based on Circular Letter of the Director General of Highways No.9 / SE / DB 2015 Implementation of road handling carried out by service providers use the Long Segment System. In the implementation of road handling carried out by service providers with a long segment contract system, service providers must meet the level of road service conditions, so that service providers are able to meet road quality standards. Because road management in Banten Province currently uses the Long Segment System, it is necessary to analyze all aspects of handling the system. This study analyzes these aspects with the AHP (Analytical Hierarchy Process approach based on interviews and questionnaires. Based on the results of the analysis found in long segment work on the highway, the most important aspect to consider is the Drainage Aspect, and the drainage work needs to pay attention to the smooth work all types of channels made in drainage work. sepanjang 564 kilometer tersebar di beberapa kabupaten dan kota di wilayah Banten. Dalam mengelola implementasi jalan, diperlukan sumber daya yang memadai sehingga tindakan yang cepat dan tepat dapat diambil untuk mengurangi keluhan dari pengguna jalan/masyarakat. Implementasi penanganan jalan yang dilakukan oleh penyedia layanan dengan sistem kontrak konvensional harus dilakukan melalui proses pengadaan yang melewati prosedur berdasarkan hukum dan peraturan yang berlaku, yaitu berdasarkan Surat Edaran Direktur Jenderal Bina Marga No.9/SE/DB Tahun 2015 Implementasi penanganan jalan yang dilakukan oleh penyedia layanan menggunakan Sistem Segmen Panjang. Dalam pelaksanaan penanganan jalan yang dilakukan oleh penyedia jasa dengan sistem kontrak segmen panjang, penyedia jasa harus memenuhi tingkat kondisi layanan jalan, ini agar penyedia jasa mampu memenuhi standar kualitas jalan. Karena manajemen jalan di Provinsi Banten saat ini menggunakan Sistem Segmen Panjang, maka perlu analisis segala aspek dalam penanganan sistem tersebut. Penelitian ini menganalisis aspek-aspek ini dengan pendekatan AHP (Analytical Hierarchy Process yang didasarkan dari wawancara dan kuesioner. Berdasarkan hasil analisis ditemukan dalam pekerjaan long segment pada jalan raya, aspek terpenting yang harus diperhatikan adalah Aspek Drainase, dan pada pekerjaan drainase perlu memperhatikan lancaranya pekerjaan semua jenis saluran yang dibuat dalam pekerjaan drainase.


2020 ◽  
Vol 32 (7) ◽  
Author(s):  
Muhammad Azeem Akbar ◽  
Arif Ali Khan ◽  
Abdul Wahid Khan ◽  
Sajjad Mahmood

Sign in / Sign up

Export Citation Format

Share Document