Analysis of Cost Control Process in PT. S’ Project Management on a 2018’s Work Package: Constructing a 100-Tonne-Capacity Integrated Cold Storage Facility in Kampar District
Keyword(s):
2012 ◽
Vol 1
(10)
◽
pp. 97-102
Keyword(s):
2011 ◽
pp. 190-207
Keyword(s):
2010 ◽
Vol 44-47
◽
pp. 910-914