scholarly journals Study on Insulation of Middle Joint of Power Supply Line of High Speed Railway

Author(s):  
Fei Jia ◽  
Xiaodong Zhang ◽  
Dandan Liu
Energies ◽  
2021 ◽  
Vol 14 (1) ◽  
pp. 253
Author(s):  
Si Wu ◽  
Mingli Wu ◽  
Yi Wang

The existing problems of the traction power-supply system (i.e., the existence of the neutral section and the power quality problems) limit the development of railways, especially high-speed railways, which are developing rapidly worldwide. The existence of the neutral section leads to the speed loss and traction loss as well as mechanical failures, all of which threaten the fast and safe operation of the train and the system. Meanwhile, the power quality problems (e.g., the negative sequence current, the reactive power, and the harmonic) can bring a series of problems that cannot be ignored on the three-phase grid side. In response, many researchers have proposed co-phase power-supply schemes to solve these two problems simultaneously. Given that the auto-transformer (AT) power-supply mode has become the main power-supply mode for the high-speed railway traction power-supply system, it has a bright future following the rapid development of the high-speed railway. In addition, there is no co-phase power-supply scheme designed for AT power-supply mode in the existing schemes. Therefore, the main contribution of this paper is to propose a specifically designed power-supply mode more suitable for the AT, as well as to establish the control systems for the rectifier side and the inverter side. In addition, for the proposed scheme, the operation principle is analyzed, the mathematical model is built, and the control system is created, and its functionality is verified by simulation, and its advantages are compared and summarized finally. The result proves that it can meet functional requirements. At the same time, compared with the existing co-phase power-supply scheme, it saves an auto-transformer in terms of topology, reduces the current stress by 10.9% in terms of the current stress of the switching device, and reduces the power loss by 0.25% in terms of the entire system power loss, which will result in a larger amount of electricity being saved. All of this makes it a more suitable co-phase power-supply scheme for the AT power-supply mode.


2021 ◽  
Vol 5 (5) ◽  
pp. 39-43
Author(s):  
Maksim V. SHEVLYUGIN ◽  
◽  
Daria V. SEMENOVA ◽  

When developing a high-speed contact suspension for railways electrified with alternating current, it is important to ensure that the electric rolling stock passes the neutral insert without turning off the current and without reducing the speed of movement. The article provides an analysis of previously developed devices in the field of power supply of electrified railways of single-phase alternating current, in which an attempt was made to pass an electric rolling stock of a neutral insert without disconnecting the load. The device of isolating coupling of a catenary and a neutral insert for high-speed railway lines electrified on alternating current is described. In this case, the passage of the neutral insert is carried out under current and braking of the electric rolling stock will not occur. Among other things, to improve the efficiency of high-speed contact suspension for railways electrified with alternating current, it is proposed to use new materials and new technologies that can be used in the device of insulating coupling of the catenary


2011 ◽  
Vol 128-129 ◽  
pp. 961-964
Author(s):  
Zhi Jian Qu ◽  
Li Liu

Railway signal is a key technology for high-speed railway,which is the foundation to keep the high-speed train line. Railway signal power is the automatic blocking of railway lines and 10kV lines transform into 380V power through after the power supply for railway signals. Signal power as the railway traffic signal of the power supply, it belongs to the first level of power system load. Its 10kV high voltage side stik up by the major of electric, 380V low voltage side maintenance by the signal major. When the signal power failure, often occur shirk responsibilities between the different majors, in order to define the responsibilities of the accident better, which need automation remote monitoring for main railway lines of the railway signal power and scheduling control as soon as possible[1-3].


2018 ◽  
Vol 138 (2) ◽  
pp. 69-75 ◽  
Author(s):  
Tetsushi Watanabe ◽  
Tomohiro Owaku ◽  
Masayuki Seto ◽  
Hitoshi Hayashiya ◽  
Yusuke Takido ◽  
...  